    Have they factored in the cost of ill will?
     
    已获得Hirn, 1472, Matt37401另外1人的支持.
  2. Tobbes

    Tobbes Member

    注册日期:
    2010-08-14
    帖子:
    993
    支持:
    2,924
    Brutal, but not wrong. The 'cottage industry' comment in the NRM report into their first restoration of a certain A3 keeps ringing true.
     
    已获得Spinner, Mrcow, Miff另外1人的支持.
  3. GWR4707

    GWR4707 Nat Pres stalwart

    注册日期:
    2006-05-12
    帖子:
    19,346
    支持:
    17,834
    性别:
    所在地:
    Cumbria
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Considering they appear to have agreed to buy 7027 and then apparently gone cap in hand to the GWS to actually pay for her (and it still being unclear if they or in fact anyone has now paid for her) I would be inclined not to assume anything, like much with this project it seems to be a bit back of envelope and changes with the wind.
     
  4. GWR4707

    GWR4707 Nat Pres stalwart

    注册日期:
    2006-05-12
    帖子:
    19,346
    支持:
    17,834
    性别:
    所在地:
    Cumbria
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Work that was done in the same workshop and at the same time as the basic erection of the frames of 4709...
     
  5. S.A.C. Martin

    S.A.C. Martin Part of the furniture

    注册日期:
    2010-08-31
    帖子:
    5,620
    支持:
    9,452
    性别:
    职业:
    Asset Engineer (Signalling), MNLPS Treasurer
    所在地:
    London
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    New build projects using all new material may cost more in the short term but provided they do their paperwork and no rework is involved, will end up cheaper in the long run. See: tornado, despite current issues.

    The Patriot is an unfortunate first time recipient of the fundamental principle that planning is everything. It needed better planning and quality assurance. Happily they are fixing what is wrong - yes, it is frustrating for them that it wasn’t right first time.

    Reusing parts is always fraught with issues and should be approach with caution.

    The Saint worked because much of the fabric of the hall was retained, it was a close conversion. The further the alterations you need and the worse condition the parts are, the more danger of getting it wrong happens.

    As for cost - repairing old has its own issues and costs and may not be cheaper than new building. The converse can be true of course, but I suspect the cost of materials and labour probably edges new build components for new build and conversion projects now.

    But what would I know? I’ve only been treasurer to a locomotive undergoing overhaul for the last year, and have been treasurer to an operating locomotive for the last four years…
     
    已获得MikeParkin65, 21B, Cartman另外3人的支持.
  6. MellishR

    MellishR Resident of Nat Pres Friend

    注册日期:
    2009-04-16
    帖子:
    8,998
    支持:
    5,922
    It happened with Duke of Gloucester's restoration, I think just because of some missing paperwork.
     
  7. 61624

    61624 Part of the furniture

    注册日期:
    2006-09-27
    帖子:
    5,294
    支持:
    3,599
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I think you have inadvertently made my point for me. The loco you have been treasurer for the past year is surely an atypical example in having a steel, rather than copper, firebox, and welded repairs to steel seem to be far less technically challenging than welding copper Don't know about the other loco that you allude to, but unless it has gone through a major copper firebox repair your experience may incomplete there too. In fact, very few groups have commissioned complete new copper fireboxes as yet, so information on costs for that type of work is very thin on the ground, so I'd respectfully suggest that it is an area very few people can comment on sensibly. I would, however, be very surprised if the costs of major work (e.g building new or extensive repairs) to a copper 'box were not substantially higher than a steel example. Feel free to prove me wrong, though, with some facts.
     
    已获得Mrcow的支持.
  8. Jamessquared

    Jamessquared Nat Pres stalwart

    注册日期:
    2008-03-08
    帖子:
    28,032
    支持:
    65,618
    所在地:
    LBSC 215
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I think the problems we are seeing with a number of projects amount to rather more than just missing paperwork.

    Tom
     
  9. 35B

    35B Nat Pres stalwart

    注册日期:
    2011-06-18
    帖子:
    29,209
    支持:
    29,654
    性别:
    所在地:
    Grantham
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Indeed, I suspect that "missing paperwork" is very often a symptom of something deeper.
     
    已获得Hampshire UnitTobbes的支持.
  10. Matt37401

    Matt37401 Nat Pres stalwart

    注册日期:
    2014-06-08
    帖子:
    15,552
    支持:
    11,961
    所在地:
    Wnxx
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I’d agree with that, I think there’s some who think that on having a had a look in the latest Hornby, Bachmann, Lima, Mainline etc catalogue seem to think that whatever they’ve seen in those publications can be kitbashed in 1:1 scale.
    I seem to recall the A1 trust way back in the mid 90’s thought it would be a good idea to reuse the frames of a certain A3’s tender, after a while the decision was changed to ‘shall we just build a new one instead?’ After realising how much it easier it would be with all the mods and paper work it would entail.
     
    已获得1472clinker的支持.
  11. gwralatea

    gwralatea Member

    注册日期:
    2014-12-31
    帖子:
    569
    支持:
    1,149
    性别:
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Indeed - and after their own false starts the current team on the Clan are setting the gold standard for documentation and pre-work. I've said before that even if that project doesn't ultimately succeed - I am a member so I very much hope it does - it's going to leave an absolute library of technical and certification documentation on How To Build A Steam Engine.
     
    已获得Spinner, ghost, S.A.C. Martin另外1人的支持.
  12. clinker

    clinker Member

    注册日期:
    2016-10-08
    帖子:
    615
    支持:
    372
    性别:
    所在地:
    romford
    Heritage Railway Volunteer:
    No I do not currently volunteer
    As I remember It the debarkle over Duke of Gloucester was not so much missing, as out of date paperwork, thinking back 30 plus years I've got It in mind that the tubes had been purchased when work comenced on the boiler, and by the time the boiler was ready to have them fitted the paperwork showed them to effectively be life expired, I think that it was about seven years old. I can't remember if the tubes had been fitted prior to being condemned. Just as an aside, what was the position regarding mainline operation when the restoration of DoG comenced?
     
  13. Tobbes

    Tobbes Member

    注册日期:
    2010-08-14
    帖子:
    993
    支持:
    2,924
    I very much hope the Clan succeeds, but this is a really important point.
     
    已获得Hirn的支持.
  14. 5944

    5944 Resident of Nat Pres

    注册日期:
    2006-01-14
    帖子:
    8,990
    支持:
    9,519
    性别:
    职业:
    Train Maintainer for GTR at Hornsey
    所在地:
    Letchworth
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I never understood the point in the Patriot lot using one wheelset from the 8F. They still needed to design and manufacture another one. Surely it wouldn't have cost that much more for a second wheelset to be made?
     
    已获得clinker, Cartman, ghost另外1人的支持.
  15. eldomtom2

    eldomtom2 New Member

    注册日期:
    2018-10-27
    帖子:
    149
    支持:
    64
    性别:
    所在地:
    Jersey
    Heritage Railway Volunteer:
    No I do not currently volunteer
    This is true, but remember 4709 is competing for people's time and money with other projects. How many people really care about seeing a working 47XX?
     
    已获得Great Western的支持.
  16. 242A1

    242A1 Well-Known Member

    注册日期:
    2006-12-03
    帖子:
    1,562
    支持:
    1,309
    I seriously doubt it. Rather like the WSR. Wonder what the common ground is here?
     
    已获得Great WesternCopper-capped的支持.
  17. Steve

    Steve Resident of Nat Pres Friend

    注册日期:
    2006-10-07
    帖子:
    12,819
    支持:
    12,019
    职业:
    Gentleman of leisure, nowadays
    所在地:
    Near Leeds
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I don't know the state of 7027's boiler but it was rumoured to be in good condition. It will depend on how it has been stored in the last 50 years but BR overhauled boilers were generally in good condition when sent to Barry and, internally are probably still OK with useful life in the firebox. If the elements have been good to it and its storage well managed so there has been little deterioration of the external plates, its overhaul may well be a relatively cheap affair. How much will depend on what is considered to be part of that boiler . Does it include the firegrate and ashpan, for example, and what about the superheater header and elements?
     
  18. Steve

    Steve Resident of Nat Pres Friend

    注册日期:
    2006-10-07
    帖子:
    12,819
    支持:
    12,019
    职业:
    Gentleman of leisure, nowadays
    所在地:
    Near Leeds
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I believe the A1 new build didn't exactly get off to a good start with a lot of the early work having to be re-done. The tender also came a cropper with regard to the brake gear of the new tender which was a direct copy of an original one. However, the inspecting authority realised that these tenders had no means of individual adjustment of the shoes and it was possible for all the brake force to be applied to just one pair of shoes and, under those circumstances they were overloaded. A new, beefed up set of brake gear had to be provided, so I'm told. It didn't apply to the existing, similar tenders as they had grandfather rights.
     
  19. 61624

    61624 Part of the furniture

    注册日期:
    2006-09-27
    帖子:
    5,294
    支持:
    3,599
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Fair points, but when it comes to quite a few items costs are likely to be the same for a new build as they would be for a repair. I'd be pleasantly surprised if the existing elements and ashpan were considered reusable but disappointed if the header wasn't, for example, and the point has been made previously that the locos at Barry generally were withdrawn with a good few years of residual life in them.
     
  20. 242A1

    242A1 Well-Known Member

    注册日期:
    2006-12-03
    帖子:
    1,562
    支持:
    1,309
    And these locomotives were withdrawn more than fifty years ago. They will have deteriorated every day since withdrawal unless conservation and protection measures were adequately put in place. The passage of time breaks everything down, rust, moth, age or fatigue, everything gets swept away sooner or later. To protect and preserve an object which you might value demands time and other resources. Sometimes a line is drawn and sometimes it has to be drawn. John Cameron drew a line and stopped keeping his locomotives in working order and there are some locomotives out there which struggle to gain enough support to keep them working. Didcot has locomotives which have not worked in decades, do long term plans exist or have lines been drawn here? They are quite keen on building yet another Churchward or Collett type out of recycled bits but so far as Gooch, Armstrong and Dean goes?
    As things currently stand it is difficult to be convinced that either 4709 or 7027 have a secure and valued future.
     