If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

GWR 5637 Overhaul Update

الموضوع في 'Steam Traction' بواسطة 32110, بتاريخ ‏28 ماي 2009.

  1. 32110

    32110 Member

    إنضم إلينا في:
    ‏20 ماي 2006
    المشاركات:
    649
    عدد المعجبين:
    794
    الجنس:
    ذكر
    الوظيفة:
    Retired from full time paid work
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    The overhaul of GWR 5637 at The East Somerset Railway was originally discussed in a now archived report. Yesterday, in atrocious conditions, marked a major milestone in the programme. The boiler, which had been upside-down was returned to its normal orientation and the frames were rewheeled. The overhaul commenced Oct 2007 is being photo recorded here http://www.eastsomersetrailway.co.uk/ga ... hp?gid=253 .

    Boiler work undertaken to date has included removal of wasted smokebox; removal to scrap of front tubeplate; removal, refurbishment and replacement of foundation ring; replacement of approx lower 1ft of throatplate and backhead plate; replacement of wasted inner firebox lap rivets with patch screws; replacement of throatplate and backhead plate down line of outer column of stays where cracks were developing following local weld plate thickening by BR; a new ashpan has been fabricated and trial fitted just prior to returning boiler right-way-up.

    Work on frames etc. to date includes thorough strip back to metal and initial repaint; overhaul vacuum brake cylinder; replacement of strengthning brackets behind front buffer beam; truing of horn guides; refurbisment of axleboxes incuding remetaling mainly the thrust faces and adjustment of bronze liners; replacement of righthand stub axle of crank axle due to loose fitting of stub into crank web (this work undertaken by Riley and Sons); many motion bushes are being replaced and new die blocks manufactured; refurbisment and replating rear bunker/water tank.
     
  2. Nigel Clark

    Nigel Clark Member Loco Owner

    إنضم إلينا في:
    ‏30 مارس 2008
    المشاركات:
    459
    عدد المعجبين:
    113
    الجنس:
    ذكر
    الوظيفة:
    Network Rail Signalman
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Pleased to hear the overhaul is progressing well. it would be nice to get '37 and '95 paired up again in the not too distant future.
     
  3. Birchwood

    Birchwood New Member

    إنضم إلينا في:
    ‏12 جوان 2008
    المشاركات:
    155
    عدد المعجبين:
    1
    What is the realistic timesclae for completion?
     
  4. 32110

    32110 Member

    إنضم إلينا في:
    ‏20 ماي 2006
    المشاركات:
    649
    عدد المعجبين:
    794
    الجنس:
    ذكر
    الوظيفة:
    Retired from full time paid work
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    We hope to complete within a year from now. Will try and keep the forum posted.
     
  5. 32110

    32110 Member

    إنضم إلينا في:
    ‏20 ماي 2006
    المشاركات:
    649
    عدد المعجبين:
    794
    الجنس:
    ذكر
    الوظيفة:
    Retired from full time paid work
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    All the old crown stays have now been removed and new ones installed. They have now to be caulked at both ends. Two photos attached showing view inside boiler over inner firebox and from the outside.
     

    الملفات المرفقة:

    • P1040033.JPG
      P1040033.JPG
      حجم الملف:
      164.7 ك. ب
      المشاهدات:
      63
    • P1040036.JPG
      P1040036.JPG
      حجم الملف:
      129.9 ك. ب
      المشاهدات:
      58
  6. 32110

    32110 Member

    إنضم إلينا في:
    ‏20 ماي 2006
    المشاركات:
    649
    عدد المعجبين:
    794
    الجنس:
    ذكر
    الوظيفة:
    Retired from full time paid work
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    The overhaul of 5637 continues to make good progress. The frames, motion, tanks and bunker are nearly complete. This week we have started to cut the small smoke tubes to length using our laser aligned mechanical hacksaw (photo)! They have been entered into the boiler and will be expanded shortly (photo). The flue tubes are due to be fitted in the next week or so.

    It is still hoped to complete late spring/early summer.
     

    الملفات المرفقة:

    • P1040334.JPG
      P1040334.JPG
      حجم الملف:
      91.2 ك. ب
      المشاهدات:
      48
    • P1040335.JPG
      P1040335.JPG
      حجم الملف:
      107.1 ك. ب
      المشاهدات:
      54
  7. Martin Perry

    Martin Perry Nat Pres stalwart Staff Member Moderator Friend

    إنضم إلينا في:
    ‏15 إبريل 2006
    المشاركات:
    16,551
    عدد المعجبين:
    7,897
    مكان الإقامة:
    1012 / 60158
    Heritage Railway Volunteer:
    Yes I am an active volunteer
  8. 1472

    1472 Well-Known Member

    إنضم إلينا في:
    ‏26 أوت 2008
    المشاركات:
    1,954
    عدد المعجبين:
    2,639
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Will the loco return with the correct GW brake valve this time??
     
  9. 32110

    32110 Member

    إنضم إلينا في:
    ‏20 ماي 2006
    المشاركات:
    649
    عدد المعجبين:
    794
    الجنس:
    ذكر
    الوظيفة:
    Retired from full time paid work
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Yes, both replica GW brake valve and blower valve have been obtained and required pipework internal to boiler re-instated.
     
  10. Nigel Clark

    Nigel Clark Member Loco Owner

    إنضم إلينا في:
    ‏30 مارس 2008
    المشاركات:
    459
    عدد المعجبين:
    113
    الجنس:
    ذكر
    الوظيفة:
    Network Rail Signalman
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Good news 32110. I look forward to seeing her back in steam this year.
     
  11. 32110

    32110 Member

    إنضم إلينا في:
    ‏20 ماي 2006
    المشاركات:
    649
    عدد المعجبين:
    794
    الجنس:
    ذكر
    الوظيفة:
    Retired from full time paid work
    Heritage Railway Volunteer:
    Yes I am an active volunteer
  12. tfftfftff86

    tfftfftff86 Member

    إنضم إلينا في:
    ‏7 جوان 2009
    المشاركات:
    964
    عدد المعجبين:
    1
    Very instructive video for me as an amateur, thanks. And so nice to see some detailed and authoritative posts about engineering progress on a restoration. Keep filming if possible, guys, perhaps an edited DVD of the later stages of a restoration might be possible. Couldn't hurt the ESR workshop's profile, I'm sure.
     
  13. 32110

    32110 Member

    إنضم إلينا في:
    ‏20 ماي 2006
    المشاركات:
    649
    عدد المعجبين:
    794
    الجنس:
    ذكر
    الوظيفة:
    Retired from full time paid work
    Heritage Railway Volunteer:
    Yes I am an active volunteer
  14. 32110

    32110 Member

    إنضم إلينا في:
    ‏20 ماي 2006
    المشاركات:
    649
    عدد المعجبين:
    794
    الجنس:
    ذكر
    الوظيفة:
    Retired from full time paid work
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Today, 12/4/2010, 5637's boiler received both the out of frames hydraulic and steam test certs. Expected completion is early June 2010.
     
  15. Kinghambranch

    Kinghambranch Well-Known Member

    إنضم إلينا في:
    ‏20 ديسمبر 2006
    المشاركات:
    1,879
    عدد المعجبين:
    1,612
    الجنس:
    ذكر
    الوظيفة:
    Retired
    مكان الإقامة:
    White Rose County
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Great news! It will be good to see this loco back in service.
     
  16. 32110

    32110 Member

    إنضم إلينا في:
    ‏20 ماي 2006
    المشاركات:
    649
    عدد المعجبين:
    794
    الجنس:
    ذكر
    الوظيفة:
    Retired from full time paid work
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    The boiler, tanks and cab were refitted today, 4 May 2010.
     

    الملفات المرفقة:

    • P1040614.JPG
      P1040614.JPG
      حجم الملف:
      95 ك. ب
      المشاهدات:
      131
  17. Kinghambranch

    Kinghambranch Well-Known Member

    إنضم إلينا في:
    ‏20 ديسمبر 2006
    المشاركات:
    1,879
    عدد المعجبين:
    1,612
    الجنس:
    ذكر
    الوظيفة:
    Retired
    مكان الإقامة:
    White Rose County
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Very nice! More good news regarding GWR locomotives!
     
  18. Mighty Mogul

    Mighty Mogul Well-Known Member

    إنضم إلينا في:
    ‏5 يناير 2007
    المشاركات:
    1,462
    عدد المعجبين:
    6
    الوظيفة:
    Artist
    مكان الإقامة:
    7037
    Great to see the loco looking nearly complete again. Doesn't seem like 5 minutes ago I saw her in a similar condition at Blunsdon following restoration - can't believe that was over ten years ago! Is that evidence of BR lined green in the photo above?
     
  19. Roosterrory

    Roosterrory Member

    إنضم إلينا في:
    ‏26 إبريل 2006
    المشاركات:
    455
    عدد المعجبين:
    85
    الوظيفة:
    Fireman/Fitter at PDSR
    مكان الإقامة:
    Churston or Cranmore
    it sure is
     
  20. Roosterrory

    Roosterrory Member

    إنضم إلينا في:
    ‏26 إبريل 2006
    المشاركات:
    455
    عدد المعجبين:
    85
    الوظيفة:
    Fireman/Fitter at PDSR
    مكان الإقامة:
    Churston or Cranmore
    Just to let you know the old girl was pottering around Cranmore sheds this weekend, with the overhaul very near completion. She has her formal Steam test this coming thursday, after which a series off running in trials will be completed before her grand re-entry to traffic over the weekend off 5th & 6th June. It is hoped the painting will be completed, but she may appear in unlined BR Green untill after the event. Concluding the weekend, she will return to the workshop for the lining to be completed.

    We hope to see you all there over the Vintage Gala weekend and we look forward to welcoming her back where she belongs after 3 years off very hard work.
     

مشاركة هذه الصفحة