If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

Pen-y-Mount

Тема в разделе 'Narrow Gauge Railways', создана пользователем lynton&barnstaple, 13 июн 2010.

  1. lynton&barnstaple

    lynton&barnstaple Member

    Дата регистрации:
    15 ноя 2009
    Сообщения:
    218
    Симпатии:
    4
    It is interesting to hear that WHHR intends to go ahead building a platform at Pen-y-Mount considering the current state of play.
     
  2. Jark91

    Jark91 Member

    Дата регистрации:
    26 дек 2009
    Сообщения:
    249
    Симпатии:
    3
    Does Pen-y-Mount not already have a platform?
     
  3. lynton&barnstaple

    lynton&barnstaple Member

    Дата регистрации:
    15 ноя 2009
    Сообщения:
    218
    Симпатии:
    4
    Yes but towards the WHHR. It is their intention to build a platform on the RHe side...they claim to own that land
     
  4. 48DL

    48DL Member

    Дата регистрации:
    21 июл 2008
    Сообщения:
    327
    Симпатии:
    24
    Адрес:
    North Warwickshire
    WHHR do own the land but, and its a big but, it is up to FR & WHR if they wish to stop there, it is totally their choice and what the hell? its not going to cost them a penny.
     
  5. TonyW

    TonyW New Member

    Дата регистрации:
    23 май 2006
    Сообщения:
    165
    Симпатии:
    9
    They should remove the connection and put up a large sign reading something like:

    A DREAM DIED HERE - BECAUSE BOYS WILL ALWAYS SQUABBLE OVER THEIR TOYS

    I'm not taking sides: Both railways have their faults.
     
  6. AndrewT

    AndrewT Member

    Дата регистрации:
    16 окт 2007
    Сообщения:
    735
    Симпатии:
    50
    Род занятий:
    F&WHR Spin Doctor
    Адрес:
    Maentwrog
    Dreaming's no good. You have to actually make things happen.
     
  7. lynton&barnstaple

    lynton&barnstaple Member

    Дата регистрации:
    15 ноя 2009
    Сообщения:
    218
    Симпатии:
    4
    Personally I can never see this platform being used except for a special working as the RHe would have nothing to gain but passengers to lose from their retail outlets.
     
  8. lostlogin

    lostlogin Member

    Дата регистрации:
    9 июл 2007
    Сообщения:
    444
    Симпатии:
    228
    For those not familiar with the ins and outs, when you state that WHHR own the land I presume that you mean they own the land they intend to build the platform on rather than they own the land that the track WHR of the is built on?
     
  9. TonyW

    TonyW New Member

    Дата регистрации:
    23 май 2006
    Сообщения:
    165
    Симпатии:
    9
    A fair point.

    How about:
    NOTHING HAPPENED HERE - BECAUSE BOYS WILL ALWAYS SQUABBLE OVER THEIR TOYS
     
  10. 48DL

    48DL Member

    Дата регистрации:
    21 июл 2008
    Сообщения:
    327
    Симпатии:
    24
    Адрес:
    North Warwickshire
    I do indeed (mean the platform bit is WHHR land not the trackbed)
     
  11. 48DL

    48DL Member

    Дата регистрации:
    21 июл 2008
    Сообщения:
    327
    Симпатии:
    24
    Адрес:
    North Warwickshire
    What about people riding on the WHHR and then joining a train to any of the stations on th F & WHR? Some income to be made there surely??
     
  12. SillyBilly

    SillyBilly Member

    Дата регистрации:
    19 май 2007
    Сообщения:
    512
    Симпатии:
    6
    Род занятий:
    Student
    Адрес:
    Penrhyndeudraeth
    Is the flat crossing strike in treddle from the C'fon direction quite close to P-Y-M station?

    If it is, as I see it, would you really want to stop the train, either parked over an Open Crossing, or having initiated the Cae Pawb procedure should the treddle be quite close to the station, possibly taking up the NR line for longer than is needed?
     
  13. AndrewT

    AndrewT Member

    Дата регистрации:
    16 окт 2007
    Сообщения:
    735
    Симпатии:
    50
    Род занятий:
    F&WHR Spin Doctor
    Адрес:
    Maentwrog
    IIRC it's pretty much alongside the north end of PyM platform.
     
  14. Christopher125

    Christopher125 Part of the furniture

    Дата регистрации:
    30 ноя 2005
    Сообщения:
    2.846
    Симпатии:
    581
    Адрес:
    Isle of Wight
    Yes, but less income than if they'd travelled via Harbour station. There's also the problem that northbound, passengers wont leave the train at PyM but potentially quite a few could try and join - going by current loadings, there's a real risk that some wont be able to get on and that could prove an issue for the WHHR when it comes to giving full refunds if they do through ticketing. Unfortunately there are no easy solutions...

    Chris
     
  15. glastonrail

    glastonrail New Member

    Дата регистрации:
    9 янв 2008
    Сообщения:
    154
    Симпатии:
    2
    Род занятий:
    Civil Engineering Student at the University of Ply
    Адрес:
    Plymouth/Stockport, England
    Possibly use something similar to St. Mary's station on the IoM, where the level crossing is right at the end of the platform. The station master activiates the sequence for the crossing lights just before the train departs (Douglas-bound) using a key switch mounted on the wall. Similarly at Rudyard Lake (10.25") the crossing lights at Rudyard station are activated by the guard or loco crew just before departure; treadles activate it coming the other way.

    Something similar could be employed at P-y-M I'm sure... ...

    Dom
     
  16. SillyBilly

    SillyBilly Member

    Дата регистрации:
    19 май 2007
    Сообщения:
    512
    Симпатии:
    6
    Род занятий:
    Student
    Адрес:
    Penrhyndeudraeth
    Then every single train would have to stop there, adding to an allready long journey time.
     
  17. 48DL

    48DL Member

    Дата регистрации:
    21 июл 2008
    Сообщения:
    327
    Симпатии:
    24
    Адрес:
    North Warwickshire
    It may not generate as much revenue as passengers joining the train at Harbour station but it would still be revenue and apart from the cost of printing a ticket, no cost to F & WHR, they have not had to pay for the platform....... or am I missing something glaringly obvious? (It has been known for me to do that on occasion)
     
  18. sycamore

    sycamore Member

    Дата регистрации:
    17 авг 2009
    Сообщения:
    596
    Симпатии:
    238
    Пол:
    Мужской
    Род занятий:
    Guard & Signalman (E&BAR) / Driver (HVMR)
    Адрес:
    Embsay or Bolton Abbey, sometimes in between...
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Anybody know what the proposed number of trains is expected to be at any one time? At the moment I believe it is 2, seems a long line for just two trains even with 25mph running!

    I have read somewhere (www.isengard.co.uk I think), that only 6 trains are going to run through to Port? How many are likely to terminate at Pont Croesor? Surley Pen-y-Mount would be a more suitable destination if Harbour is likely to get too conjested? - at least you could walk into town!

    Regards
    Will.

    Embsay
     
  19. AndrewT

    AndrewT Member

    Дата регистрации:
    16 окт 2007
    Сообщения:
    735
    Симпатии:
    50
    Род занятий:
    F&WHR Spin Doctor
    Адрес:
    Maentwrog
    The timetable has not been finalised.
     
  20. TonyW

    TonyW New Member

    Дата регистрации:
    23 май 2006
    Сообщения:
    165
    Симпатии:
    9
    From http://www.caernarfonherald.co.uk/caernarfon-county-news/local-caernarfon-news/2010/06/17/final-welsh-highland-railway-link-work-to-start-soon-in-porthmadog-88817-26666520/

    Quote:
    Full passenger services are expected to start in early 2011, with Andrew Thomas adding: “The next few months will be about ensuring that everything works and is ready for next year, from the level crossings to warning lights. A train will take less than 30 seconds to cross the road, so it should have no effect on traffic flows, and there is a speed limit imposed of 10mph. We will only be looking to terminate around six trains a day at Porthmadog Harbour Station, with the remainder of our services on the Welsh Highland Railway terminating at Pont Croesor.”

    30 seconds to cross Britannia Bridge seems ambitious to me.
     

Поделиться этой страницей