If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

Current and Proposed New-Builds

Тема в разделе 'Steam Traction', создана пользователем aron33, 15 авг 2017.

  1. Jamessquared

    Jamessquared Nat Pres stalwart

    Дата регистрации:
    8 мар 2008
    Сообщения:
    27.793
    Симпатии:
    64.460
    Адрес:
    LBSC 215
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Actually, I think it was entirely logical. The testing showed that it was the combination of track and p/way that led to problems. However, having taken an entire class of almost new locos out of service, a moderate cost rebuild to get them all back in traffic was clearly more cost effective than waiting for years before the p/way came up to scratch, even though long term that was clearly necessary. So it was a very sound business decision to rebuild them even though they ran steadily on the East Coast Mainline when on trial.

    Holcroft was of the view that the whole B4x rebuild was ruined because they put on a decent boiler and then ignored the valves - a case of spoiling the ship for a ha'p'orth of tar.

    "What a fine engine the B4/x would have been given 10 in. dia. long travel piston valves as in Maunsell's E1 class!" (Locomotive Adventure Vol 2. page 162)

    Well, some of the rebuilds were top notch. The A1x, C2x, E6x rebuilds were all a success; the others much less so.

    Tom
     
    Last edited: 17 сен 2017
  2. Jamessquared

    Jamessquared Nat Pres stalwart

    Дата регистрации:
    8 мар 2008
    Сообщения:
    27.793
    Симпатии:
    64.460
    Адрес:
    LBSC 215
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I'm fairly certain that his stated wish was that he didn't want to have a locomotive named after him. The line is his memorial, and the summit is generally called Holden Summit, which seems appropriate.

    Tom
     
    S.A.C. Martin нравится это.
  3. 30854

    30854 Resident of Nat Pres

    Дата регистрации:
    8 мар 2017
    Сообщения:
    12.172
    Симпатии:
    11.496
    Пол:
    Мужской
    Род занятий:
    Retired
    Адрес:
    Brighton&Hove
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Aye... true.... but there's a bit of a difference between something "useable" and something "suitable". Saving something from the axe-man (or government museums policy!) is a way aways from deliberately setting about a new build express loco. Driver size is the main reason I'd prefer a newbuild I1x to an I3, even though one of the latter was more deserving of preservation in it's own right IMO.

    Totally WIBN as things stand, but there's much to be said for interchangability of parts, even on a heritage line, so my own hankering for a D1 wouldn't exactly harm the chances for a D2 as well, in the fullness of time.
     
    Gav106 нравится это.
  4. 30854

    30854 Resident of Nat Pres

    Дата регистрации:
    8 мар 2017
    Сообщения:
    12.172
    Симпатии:
    11.496
    Пол:
    Мужской
    Род занятий:
    Retired
    Адрес:
    Brighton&Hove
    Heritage Railway Volunteer:
    No I do not currently volunteer
    If that was Mr Holden's expressed wish, who am I to argue? Point cheerfully conceded.

    Regarding the [post#681] point about the piston valves, I'm in full agreement, but my point about suspect stability (made in the same review IIRC) needs a look-see, were anyone to suggest a new build. Perhaps, especially as they were nearly as long lived, one of the originals (with steam circuit suitably optimised!) might be preferable?

    While it's pointless to disagree with the logic of rebuilding the "Rivers", it was the associated blanket ban on 2-6-4T's on passenger work I find odd. Presumably, trailing truck aside, the 2-6-0 chassis wasn't all that different, so such issues as lead to instability were presumably to do with centre of gravity, as with the Brighton "Baltics".
     
  5. maddog

    maddog New Member

    Дата регистрации:
    7 апр 2011
    Сообщения:
    194
    Симпатии:
    89
    Not really a new build, but how about a rebuild of an unrestored merchant navy using latest developments tailored to modern use. Not that as a class they need it though.
     
    Sheff нравится это.
  6. BrightonBaltic

    BrightonBaltic Member

    Дата регистрации:
    26 май 2011
    Сообщения:
    724
    Симпатии:
    242
    What do you think the 35011 group are doing?
     
    maddog, S.A.C. Martin, Kinghambranch и 2 другим нравится это.
  7. Hermod

    Hermod Well-Known Member

    Дата регистрации:
    6 май 2017
    Сообщения:
    1.109
    Симпатии:
    317
    Пол:
    Мужской
    Адрес:
    Klitmoeller,Denmark
    Heritage Railway Volunteer:
    No I do not currently volunteer
  8. S.A.C. Martin

    S.A.C. Martin Part of the furniture

    Дата регистрации:
    31 авг 2010
    Сообщения:
    5.615
    Симпатии:
    9.418
    Пол:
    Мужской
    Род занятий:
    Asset Engineer (Signalling), MNLPS Treasurer
    Адрес:
    London
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    [​IMG]

    I actually think it looks better as originally styled. There's a sort of GWR-esque "raging bull" sort of a front end and the cylinder spacing is very reminiscent of some of Chapelon's locomotives.

    [​IMG]

    I can't see the point of modifying something that was actually modified to be better in the first place (and proven so).

    [​IMG]

    The A2/3s didn't suffer frame fractures as badly as the A2/2s - different design of frames and stay arrangements. The full size smoke deflectors helped with smoke deflection better, and the boiler types came from a bigger pool including the later Peppercorn ones, as shown here.

    The Peppercorn A2 then took the development further forward.

    15 of each type built. The A2/3s stayed in England, the Peppercorn machines went to Scotland and took on the duties that the P2s and their rebuilds had been doing ten years before.

    Perhaps, given that the original intention by Thompson was to replace the P2s with high tractive effort Pacific types, it was simply fulfilling the original idea.
     
    Black Jim, aron33 и Kinghambranch нравится это.
  9. Sheff

    Sheff Resident of Nat Pres

    Дата регистрации:
    21 апр 2006
    Сообщения:
    8.057
    Симпатии:
    3.137
    Пол:
    Мужской
    Род занятий:
    Retired Engineer & Heritage Volunteer
    Адрес:
    N Warks
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    But what improvements do they intend to make?
     
  10. Jamessquared

    Jamessquared Nat Pres stalwart

    Дата регистрации:
    8 мар 2008
    Сообщения:
    27.793
    Симпатии:
    64.460
    Адрес:
    LBSC 215
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Undoing all Jarvis' modifications ... ;)

    Tom
     
    BrightonBaltic и Sheff нравится это.
  11. Sheff

    Sheff Resident of Nat Pres

    Дата регистрации:
    21 апр 2006
    Сообщения:
    8.057
    Симпатии:
    3.137
    Пол:
    Мужской
    Род занятий:
    Retired Engineer & Heritage Volunteer
    Адрес:
    N Warks
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I'd love to have a go at a MN - you could get away with murder under that spam can ;)
     
    BrightonBaltic и Allegheny нравится это.
  12. Hirn

    Hirn Member

    Дата регистрации:
    11 авг 2015
    Сообщения:
    512
    Симпатии:
    320
    Пол:
    Мужской
    Do we need more threads? Or classifications of them? Tags?
    One the recreation of past designs, either with no survivors or so one can run one.
    (The last has been done for the really early survivors on quite a scale - not only do we have Wylam Dilly the surviving twin to Puffing Billy
    but two modern replicas, one in Munich, one in Beamish and never mind the Rocket building saga.)
    One what one would like to build now from a clean sheet of paper, either for preserved railway operation or for the main line.
    One for the modern ways you can now design and make things, common to anything.
    (This has seen huge change welling up - computers are now setting to drive the machine tool straight through from
    the outline design, calculations and checks, welding pales in comparison. See the recent stuff on boilers in the Mutual
    Improvement Classes here.)
    And of course, we still need ones to make the best we can of using and keeping what we have got.
     
    Last edited: 18 сен 2017
    Sheff нравится это.
  13. MarkinDurham

    MarkinDurham Well-Known Member

    Дата регистрации:
    4 май 2007
    Сообщения:
    2.229
    Симпатии:
    999
    Адрес:
    Durham
    I have to say that that "995" is actually a purposeful-looking machine, and very Raven-esque with the drive on to the leading coupled wheels. Thompson's father-in-law would have been pleased, I think?
     
    Black Jim нравится это.
  14. dhic001

    dhic001 Member

    Дата регистрации:
    20 янв 2008
    Сообщения:
    312
    Симпатии:
    35
    Адрес:
    New Zealand
    An LBSCR L class is almost top of my list, despite the earlier mentioned issues. That is after a K class has been built.
    I'd also like to see a batch of Stroudley D1s built in conjunction with some new E1s. As the E1 is very similar to the D1, and we have a E1 needing major rebuilding, the logical thing would be to draw up all the components of the E1, including the bits that don't need replacing on Burgundy, and mass produce the parts needed for some D1s and E1s. Both classes would be suitable for the Bluebell and Spa Valley (but please with the Stroudley boiler), and no doubt the Isle of White wouldn't mind another E1.
    Daniel
     
  15. S.A.C. Martin

    S.A.C. Martin Part of the furniture

    Дата регистрации:
    31 авг 2010
    Сообщения:
    5.615
    Симпатии:
    9.418
    Пол:
    Мужской
    Род занятий:
    Asset Engineer (Signalling), MNLPS Treasurer
    Адрес:
    London
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    But that's not how it actually was. That's the image posted earlier that's been modified to make it look like that!
     
  16. BrightonBaltic

    BrightonBaltic Member

    Дата регистрации:
    26 май 2011
    Сообщения:
    724
    Симпатии:
    242
    The thing is that, if you're going to build a Thompson Pacific, it's going to need quite a bit fixing... and the logical conclusions of those improvements would land you exactly where Peppercorn ended up, so as we've got an A2 and a new-build A1, it's really rather pointless, isn't it?
     
    MarkinDurham, 2392 и paulhitch нравится это.
  17. MarkinDurham

    MarkinDurham Well-Known Member

    Дата регистрации:
    4 май 2007
    Сообщения:
    2.229
    Симпатии:
    999
    Адрес:
    Durham
    Well yes, quite so, Simon, but I was merely making the point that that image does look good :) Quite what the practicalities of building it as opposed to the locomotives he did actually build would have been is, of course, another matter...
     
  18. Cartman

    Cartman Part of the furniture

    Дата регистрации:
    14 дек 2015
    Сообщения:
    2.755
    Симпатии:
    2.109
    Пол:
    Мужской
    Род занятий:
    Van driver
    Адрес:
    Cheshire
    Heritage Railway Volunteer:
    No I do not currently volunteer
    And my suggestion of a Claughton was felt to be not the most sensible choice:D:D
     
  19. 2392

    2392 Well-Known Member

    Дата регистрации:
    7 июн 2010
    Сообщения:
    1.902
    Симпатии:
    1.148
    Пол:
    Мужской
    Адрес:
    Felling on Tyne
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    And now for something totally different to all the previous suggestions. Considering that the East Coast Mainline has been electrified since 1989 from Edinburgh to London, a new build electric locomotive based on the ill starred Raven Express Electric No. 13. Ok the new machine No. 14 would have a modern 25Kv AC power plant, rather than the 1500 DC electricals. Also the third rail contact shoes would be for show only and the power would be drawn from the overhead lines. The 3rd rail shoes meant that the original loco No 13 could run on the North Tyneside loop as it was powered that way.

    Edit; I forgot to say that No 13 was fitted with overhead pantographs. Just like Nos 3-12 the Newport [Thornaby] - Shildon frieght electrics. As well as the third rail contact shoes like Nos1-2 and Tyneside EMU electrics.
     
    Last edited: 18 сен 2017
    andrewshimmin и 30854 нравится это.
  20. 30854

    30854 Resident of Nat Pres

    Дата регистрации:
    8 мар 2017
    Сообщения:
    12.172
    Симпатии:
    11.496
    Пол:
    Мужской
    Род занятий:
    Retired
    Адрес:
    Brighton&Hove
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I like it! But why dummy 3rd rail shoes? We haven't had anything in NER livery hauling a special south of the Thames for....... ever(?). Now that would be different!
     
    MellishR и BrightonBaltic нравится это.

Поделиться этой страницей