If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

GWSR Broadway Developments

本贴由 Breva2014-08-01 发布. 版块名称: Heritage Railways & Centres in the UK

  1. Breva

    Breva Well-Known Member

    注册日期:
    2010-10-11
    帖子:
    2,380
    支持:
    4,159
    所在地:
    Gloucestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    The question came up at the volunteers meeting, and the chairman didn't know yet.
    He did explain that generally speaking as we have resident locos with a contractual number of annual steaming days for which the railway pays them, you can't get too many guest engines (except for galas of course) as that will dilute the number of available days for the residents. That said, the number of steaming days needed will be up with the new timetable.
    When a loco goes off site and steams somewhere else (eg 2807 at Llangollen) that does count as a steaming day though.

    In reply to the question, he also said that the first passenger train out of Broadway would be headed by Foremarke Hall. Firstly, it is a vote of thanks to our own loco group, and secondly, it faces the right way! (south)

    So there you go, all very logical. It was a good meeting, all very positive.

    NB Do not try to park at Broadway station, or along the road. Until +/- August 2018 when the new car park is likely to open across the road, the nearest car park is off the Childswickham Road, a fair walk away (about 15 mins). Get on somewhere else is the advice. The station forecourt is tiny and the few spaces there are for the handfull of staff and a couple of disableds. Do not even drive up there to have a look, once we are open! You may well get stuck, and block the narrow road for the people that live there. At least negotiations for a bigger car park have borne fruit, so well done the plc board.

    We inherited a forecourt designed in 1904 to allow a horse and cart to drive up, turn round and go back down. That's it. Stay away with your motor car.
     
    已获得jncKinghambranch49010的支持.
  2. Greenway

    Greenway Part of the furniture

    注册日期:
    2008-03-16
    帖子:
    4,021
    支持:
    3,808
    性别:
    所在地:
    South Hams
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Modern motor motor cars do not fit well into any heritage arena. Maybe you could get this going and have cars park some distance away :D
    [​IMG]
    If that is too adventurous then maybe this:
    [​IMG]
     
    Last edited: 2018-01-15
  3. 49010

    49010 Well-Known Member

    注册日期:
    2012-04-23
    帖子:
    1,243
    支持:
    1,039
    性别:
    职业:
    Gentleman of Leisure
    所在地:
    Stockport
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Blimey! That first pic looks like the legendary Clapham Omnibus! Could it really be?

    Hopefully I'll only need to park my car on the Sat and Sun and I'll be doing that at Toddington (staying in Tewkesbury Fri and Sat night, then staying in Winchcombe on the Sun night). How long is the walk from Broadway Station into the town? From memory it's about 10 mins for a reasonably quick walker.
     
  4. Kinghambranch

    Kinghambranch Well-Known Member

    注册日期:
    2006-12-20
    帖子:
    1,881
    支持:
    1,619
    性别:
    职业:
    Retired
    所在地:
    White Rose County
    Heritage Railway Volunteer:
    No I do not currently volunteer
    2999?;)
     
  5. flying scotsman123

    flying scotsman123 Resident of Nat Pres

    注册日期:
    2013-09-09
    帖子:
    10,707
    支持:
    18,814
    性别:
    所在地:
    Cheltenham
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Ooh yes please!
     
  6. Andy B

    Andy B Member

    注册日期:
    2007-07-31
    帖子:
    507
    支持:
    755
    所在地:
    Bristol
    We had a gala committee meeting on Saturday (over 3 hours) all o can say at this stage is that negotiations are ongoing with locomotive owners and that as soon as we have some positive news we will let everyone know. We’ve allowed for three guest locomotives in the budget which should push all the right buttons. A draft timetable has been produced which has I believe 10 Trains going to broadway. I’m sorry were unable to say any more at present, it’s not for lack of trying!
     
    已获得49010的支持.
  7. Breva

    Breva Well-Known Member

    注册日期:
    2010-10-11
    帖子:
    2,380
    支持:
    4,159
    所在地:
    Gloucestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Ballast dropping resumed today, in the stretch from Pry Lane to the Broadway goods shed.
    You can see a video of it here:

    Two train loads of 6 Dogfish each were discharged. One more will see us up to the Broadway southern turnout.
    At the moment we are prevented from crossing the Station Road bridge due to the strike repairs going on, but the contractor is doing well and it shouldn't be too long before we can enter the station itself again, to do Broadway north and platform 2. A bridges blog update should be available tomorrow afternoon late.

    I updated the extension blog as well, with inter alia news of 76077 and a shot of the canopy extension foundations. All good fun, we are going places!
     
    已获得jnc, 49010, Kinghambranch另外3人的支持.
  8. Mark Thompson

    Mark Thompson Well-Known Member

    注册日期:
    2017-09-10
    帖子:
    1,664
    支持:
    4,124
    性别:
    所在地:
    E sussex
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Great to see a close-up of the Shark in action!
    That wind sounds both cold and incessant.
     
  9. toplight

    toplight Well-Known Member

    注册日期:
    2009-05-18
    帖子:
    1,351
    支持:
    1,288
    所在地:
    Swindon, England
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    It is a shame in some way that the Caravan Park (former goods yard) is there as this might have given space for Parking and other facilities. Was this sold off by BR or by the GWR themselves ?
     
  10. Kinghambranch

    Kinghambranch Well-Known Member

    注册日期:
    2006-12-20
    帖子:
    1,881
    支持:
    1,619
    性别:
    职业:
    Retired
    所在地:
    White Rose County
    Heritage Railway Volunteer:
    No I do not currently volunteer
    It was sold off a long time ago, but the Goods Shed was in GWSR ownership until relatively recently.
     
  11. Breva

    Breva Well-Known Member

    注册日期:
    2010-10-11
    帖子:
    2,380
    支持:
    4,159
    所在地:
    Gloucestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    A first report on the Broadway bridge strike repair has now been posted on the bridges blog:
    http://bridgestobroadway.blogspot.co.uk/2018/01/broadway-bridge-strike-repair.html

    Here are a couple of pictures of the damage:

    Br. 01. Damage to U-S E. track bearer - 27.2.17..JPG

    This buckled girder sits directly underneath one of the rails.

    Br. 01. Centre main girder latest strike buckle..JPG

    Can you imagine the force required to buckle a sandwich of three heavy plates like this? And this was not the point of first contact, but a girder in the centre of the bridge, i.e. a secondary strike.

    The pounding our bridge gets, at least 12 strikes of varying severity since the refurb in 2014, has forced a serious think about our options, and something will be done.
     
    已获得Bill Drewett, jnc, The Dainton Banker另外2人的支持.
  12. AndyY

    AndyY Member

    注册日期:
    2013-02-23
    帖子:
    433
    支持:
    480
    That is serious damage! What is the speed limit under the bridge? But I guess an idiot who doesn't know the height of his load is unlikely to obey a speed limit anyway.............
     
  13. Breva

    Breva Well-Known Member

    注册日期:
    2010-10-11
    帖子:
    2,380
    支持:
    4,159
    所在地:
    Gloucestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    The speed limit is 30 mph. However, the bridge is at the bottom of a slight slope either way, and the actual speed of the majority of vehicles here is higher. It is quite easy to do 40 mph, just by closing the throttle at the top of Pennylands bank (Evesham Road) and rolling downhill.
     
  14. threelinkdave

    threelinkdave Well-Known Member

    注册日期:
    2013-08-01
    帖子:
    2,065
    支持:
    1,240
    性别:
    职业:
    Retired
    所在地:
    Stratford-upon-Avon or in a brake KD to BH
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Is it possible to erect sacrificial girders either side of the bridge. If there is an overheight vehicle it gets caught by the girders not the bridge itself
     
    已获得The Dainton Banker的支持.
  15. Jamessquared

    Jamessquared Nat Pres stalwart

    注册日期:
    2008-03-08
    帖子:
    28,028
    支持:
    65,609
    所在地:
    LBSC 215
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    If I read the blog correctly, that was unknown time and therefore presumably the vehicle involved didn’t report it? The mind boggles at the state of damage to the vehicle involved, or how you could think you’d no need to stop!

    Tom
     
  16. DragonHandler

    DragonHandler Well-Known Member

    注册日期:
    2016-05-27
    帖子:
    1,286
    支持:
    1,590
    性别:
    所在地:
    West London
    Heritage Railway Volunteer:
    No I do not currently volunteer
    How about attaching a few spikes to the girder to impale offending vehicles so they can't drive away.:Woot:

    (this is not a serious suggestion, just a slightly evil thought :eek:)
     
    已获得The Dainton BankerMark Thompson的支持.
  17. DragonHandler

    DragonHandler Well-Known Member

    注册日期:
    2016-05-27
    帖子:
    1,286
    支持:
    1,590
    性别:
    所在地:
    West London
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I think there's possibly two reasons why they don't stop.
    1. They aren't bright enough to realise they've damaged the bridge, even though the strike must have been felt and made a huge noise.
    2. They're bright enough to know that if they stop they could have to pay for the bridge repair as well as the damage to their lorry.
     
  18. Mark Thompson

    Mark Thompson Well-Known Member

    注册日期:
    2017-09-10
    帖子:
    1,664
    支持:
    4,124
    性别:
    所在地:
    E sussex
    Heritage Railway Volunteer:
    No I do not currently volunteer
    That is appalling. The mind boggles at the damage which must have been inflicted on the vehicles concerned in all these strikes. how they managed to limp away from the scene, god alone knows.
    One could imagine the ribs of the Titanic looking a bit like this after its altercation with the iceberg. A pair of real **** off bash-beams, preferably with very sharp leading edges is surely the only prevention for this
     
  19. Breva

    Breva Well-Known Member

    注册日期:
    2010-10-11
    帖子:
    2,380
    支持:
    4,159
    所在地:
    Gloucestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    It's not the vehicles that get damaged, but the load. And the load, in the worst case, is an excavator with a thick steel arm sticking out. That is what did the damage in the pictures. It's just 6 ins across, but solid steel.
    The others were lorries carrying skips. These tend to rip off the rivets from underneath.
    I actually photographed one after he hit the bridge. He was zig-zagging away backwards up Pennylands bank. We managed to stop him at the next roundabout, and he denied hitting the bridge!
    Believe me, when you've heard a bridge strike, you know what it was. The noise is unmistakable.
     
    已获得Kinghambranch的支持.
  20. Mark Thompson

    Mark Thompson Well-Known Member

    注册日期:
    2017-09-10
    帖子:
    1,664
    支持:
    4,124
    性别:
    所在地:
    E sussex
    Heritage Railway Volunteer:
    No I do not currently volunteer
    It must be like a thunderclap.
     

分享此页面