    Couple of points. In reply to SpudUk there is another carriage in the works (number 9) but it's due after Van 23 and has been progressed quite far.
    If there were a 2 section railway, one could perhaps quasi-mothball the shorter section and have just one or two people there hiring out rail-bikes to any visitors, available on certain dates only.
     
    أعجب بهذه المشاركة H Cloutt
  2. Biermeister

    Biermeister Member

    إنضم إلينا في:
    ‏4 أوت 2019
    المشاركات:
    361
    عدد المعجبين:
    669
    الجنس:
    ذكر
    الوظيفة:
    Brewer
    مكان الإقامة:
    Daylesford, Victoria, Australia
    Heritage Railway Volunteer:
    No I do not currently volunteer
    'And what,' said Pooh 'if it didn't?'
     
    The Dainton Banker, Snail368 و H Cloutt معجبون بهذا.
  3. green five

    green five Resident of Nat Pres

    إنضم إلينا في:
    ‏30 إبريل 2006
    المشاركات:
    6,781
    عدد المعجبين:
    2,614
    الجنس:
    ذكر
    الوظيفة:
    Design Draughtsman
    مكان الإقامة:
    Hampshire
    Heritage Railway Volunteer:
    No I do not currently volunteer
    They have found Lew in Argentina......;)
     
    Mrcow, Biermeister, Snail368 و 3 آخرون معجبون بهذا.
  4. 30854

    30854 Resident of Nat Pres

    إنضم إلينا في:
    ‏8 مارس 2017
    المشاركات:
    12,172
    عدد المعجبين:
    11,496
    الجنس:
    ذكر
    الوظيفة:
    Retired
    مكان الإقامة:
    Brighton&Hove
    Heritage Railway Volunteer:
    No I do not currently volunteer
    That throws up some interesting challenges. Straight away, you need to be asking the question of how likely to be an ongoing operational 'pinch point' 'traditional' signalling is likely to prove on a line which will* ultimately involve (at least the original) four passing places, plus the termini.

    *I see no harm in an expression of confidence in the longterm prospects for the line.
     
    Biermeister و H Cloutt معجبون بهذا.
  5. johnofwessex

    johnofwessex Resident of Nat Pres

    إنضم إلينا في:
    ‏6 إبريل 2015
    المشاركات:
    9,748
    عدد المعجبين:
    7,859
    الجنس:
    ذكر
    الوظيفة:
    Thorn in my managers side
    مكان الإقامة:
    72
    Heritage Railway Volunteer:
    No I do not currently volunteer
    My understanding is that with the possible exception of Douglas, IoM & possibly the ffestiniog in its glory days British NG lines were not 'signalled' in the normal sense and that the work such as it was was carried out by station staff. As a 'For Example' these days the Ffestiniog crew issue their own train staffs, Tallylynn ditto sometimes
     
    أعجب بهذه المشاركة H Cloutt
  6. gwralatea

    gwralatea Member

    إنضم إلينا في:
    ‏31 ديسمبر 2014
    المشاركات:
    511
    عدد المعجبين:
    1,006
    الجنس:
    ذكر
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I think this comes under the headings of nice problems to have though - not that that means no one needs to think about it now. When it's a fully rebuilt line, just short of 20 miles in length, you might assume that success breeding success as it tends to, many more volunteers will have been motivated to get involved. If it were a perfect recreation and was unable to convince enough people to go and signal it (or do anything else) something would be badly wrong somewhere.

    I would suggest that (as with other projects) there's likely to be a tipping point eventually (might be a certain length of track, the first couple of MWs in steam, whatever), when the financial and physical offers of help come rolling in and greatly outnumber the efforts of the true believers to date.*

    *actually, *that* is a huge management challenge in itself - the point where everyone doesn't know everyone else, and it all gets a bit professional... you see it in village cricket, the stalwart members drifting away when suddenly there're enough youngsters that the team's actually good. Some people like the heroic failure! Mind you, just musing on my own signature, I don't like the easy!
     
    Mark Thompson, Mrcow, Jamessquared و 1 شخص آخر معجبون بهذا.
  7. ghost

    ghost Part of the furniture

    إنضم إلينا في:
    ‏29 ماي 2006
    المشاركات:
    4,303
    عدد المعجبين:
    5,727
    الجنس:
    ذكر
    مكان الإقامة:
    N.Ireland
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    While parts have certainly been cast for the locos, I don't think it's quite accurate to say that construction is underway.

    I don't remember seeing any mention of No9 being in the works - is it confirmed that construction is underway or is it on the 'to do' list?
     
    أعجب بهذه المشاركة H Cloutt
  8. RailWest

    RailWest Part of the furniture

    إنضم إلينا في:
    ‏7 ديسمبر 2011
    المشاركات:
    3,984
    عدد المعجبين:
    7,802
    الجنس:
    ذكر
    مكان الإقامة:
    West Country
    ....but insist on swopping it for the Faukland Islands :)
     
    Miff و H Cloutt معجبون بهذا.
  9. Meiriongwril

    Meiriongwril Member

    إنضم إلينا في:
    ‏3 جوان 2007
    المشاركات:
    837
    عدد المعجبين:
    704
    الجنس:
    ذكر
    مكان الإقامة:
    Cymru
    Wow - you managed to mis-spell Talyllyn in two different places! You win the prize ....
     
    talyllyn1 و H Cloutt معجبون بهذا.
  10. RailWest

    RailWest Part of the furniture

    إنضم إلينا في:
    ‏7 ديسمبر 2011
    المشاركات:
    3,984
    عدد المعجبين:
    7,802
    الجنس:
    ذكر
    مكان الإقامة:
    West Country
    >>>> My understanding is that with the possible exception of Douglas, IoM & possibly the ffestiniog in its glory days British NG lines were not 'signalled' in the normal sense and that the work such as it was was carried out by station staff...

    Probably true in general, although there may well be other examples that I can't yet recall...

    >>> As a 'For Example' these days the Ffestiniog crew issue their own train staffs, Tallylynn ditto sometimes....

    AIUI the FR and TR use a mixture of METS and EKT systems, for which various 'remote operators' are available. AFAIK no one has (yet) devised a 'remote operator' mechanism for ETT machines. It is something which we have thought about, but at the moment it is more a case perhaps of trying to make best use of the equipment which we have. Of course, if someone would like to donate at least half a dozen pairs of NSTR instruments to the railway, we might reconsider....:) Mind you, when trying to follow Southern Rly practice for the 1920s/30s, I couldn't manage to locate even one (let along a pair of) METS instrument for 'long section' working :-(
     
    أعجب بهذه المشاركة H Cloutt
  11. 30854

    30854 Resident of Nat Pres

    إنضم إلينا في:
    ‏8 مارس 2017
    المشاركات:
    12,172
    عدد المعجبين:
    11,496
    الجنس:
    ذكر
    الوظيفة:
    Retired
    مكان الإقامة:
    Brighton&Hove
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I beg to differ .... The L&B certainly was signalled, so was the Corris ( even if the only clear images of signal posts there show them gradually 'returning into nature' during the goods only years ). Even the Southwold too had signals.

    I suspect the change came with the 1896 Light Railways Act. I believe until then, the only exception came with 'one engine in steam' operation.

    The Irish 3ft (different legislative setup) railways, as opposed to tramways, were signalled. Amazingly, images of the T&DLR's last years (one weekend's worth of cattle specials per month over barely maintained track on long gradients of up to 1:28) show signalling was still in use and signalling is prominent in images of the C&L during it's last month of life .... both to control trains and as photographic vantage points!
     
    H Cloutt و gwralatea معجبون بهذا.
  12. Miff

    Miff Part of the furniture Friend

    إنضم إلينا في:
    ‏17 جوان 2008
    المشاركات:
    3,000
    عدد المعجبين:
    3,023
    Actually it was in Snailbeach all the time. Good to get that off my chest at last :)
     
    John Petley, Mrcow و H Cloutt معجبون بهذا.
  13. ghost

    ghost Part of the furniture

    إنضم إلينا في:
    ‏29 ماي 2006
    المشاركات:
    4,303
    عدد المعجبين:
    5,727
    الجنس:
    ذكر
    مكان الإقامة:
    N.Ireland
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    You said S********h - you'll be for the naughty step now!
     
    Jamessquared, Miff و H Cloutt معجبون بهذا.
  14. Pete Thornhill

    Pete Thornhill Resident of Nat Pres Staff Member Administrator Moderator Friend

    إنضم إلينا في:
    ‏24 جويلية 2008
    المشاركات:
    7,762
    عدد المعجبين:
    5,890
    Now come on!!! Next you’ll be suggesting it was found pulling re-gauged Irish DMUs on the South Bedfordshire Railway ;):D
     
    Mrcow, 35B, Miff و 1 شخص آخر معجبون بهذا.
  15. 30854

    30854 Resident of Nat Pres

    إنضم إلينا في:
    ‏8 مارس 2017
    المشاركات:
    12,172
    عدد المعجبين:
    11,496
    الجنس:
    ذكر
    الوظيفة:
    Retired
    مكان الإقامة:
    Brighton&Hove
    Heritage Railway Volunteer:
    No I do not currently volunteer
    The Blue Pullmans damned nearly went the other way!
     
    أعجب بهذه المشاركة H Cloutt
  16. Meatman

    Meatman Member

    إنضم إلينا في:
    ‏10 إبريل 2018
    المشاركات:
    696
    عدد المعجبين:
    1,645
    الجنس:
    ذكر
    مكان الإقامة:
    Burrington,devon
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    My thoughts on the 2nd railway from Blackmoor to Wistlandpound are that it would act much like the Lynbarn did to help pay for any borrowing on the Inn ( it would be interesting to know what this project is going to cost, has the deal been discussed with investors of the share option, are the members going to be told of possible risks to the railway, the silence is deafening ), IMHO with the cost of living, fuel, interest rates, ect all going up, foreign travel opening up again, this is a risky move which will have to be managed extremely well , AIUI they struggle for volunteers at Woody already with many giving up more days than they normally would to make sure the railway runs every day, they are already going the extra mile, maybe they will implement split day running between the two sites but that would be of no benefit at the end of the day
     
    أعجب بهذه المشاركة H Cloutt
  17. Jamessquared

    Jamessquared Nat Pres stalwart

    إنضم إلينا في:
    ‏8 مارس 2008
    المشاركات:
    27,793
    عدد المعجبين:
    64,460
    مكان الإقامة:
    LBSC 215
    Heritage Railway Volunteer:
    Yes I am an active volunteer


    Tom
     
    Mark Thompson و H Cloutt معجبون بهذا.
  18. Breva

    Breva Well-Known Member

    إنضم إلينا في:
    ‏11 اكتوبر 2010
    المشاركات:
    2,347
    عدد المعجبين:
    4,078
    مكان الإقامة:
    Gloucestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I have added my formal support to the 5 planning applications on the ENP website. Far more supports are needed to overcome one single objection, so your formal support is very important to the project.

    How to add your support is explained very well here:
    https://www.lynton-rail.co.uk/news/planning-news-update-18th-may-2022

    I have said in the comments that the project has brought me to the area with my wife, we have supported it in cash that will be spent locally, we have paid for local accommodation, meals out, and subsequently visits to other attractions in the area. None of this would have happened without the railway project.
     
    ross, brmp201, Biermeister و 4 آخرون معجبون بهذا.
  19. RailWest

    RailWest Part of the furniture

    إنضم إلينا في:
    ‏7 ديسمبر 2011
    المشاركات:
    3,984
    عدد المعجبين:
    7,802
    الجنس:
    ذكر
    مكان الإقامة:
    West Country
    There seem to be a number of submissions already from various people which - welcome as they are - simply say in essence 'we support the railway'. Without wishing to sound 'negative', they overlook the fact that the 'railway project' itself has already been granted planning permission.

    I would suggest that for this Sec 73 application any comments of support (such as those which Breva has made need above) need to address quite specifically how the relaxation/abolition of the Grampian Conditions will help expedite the 'benefits' which have been outlined, possibly also mentioning (but others may disagree here) that otherwise there is a risk of the benefits being delayed for years, if even to be achieved at all.
     
    Mark Thompson, Biermeister و H Cloutt معجبون بهذا.
  20. Breva

    Breva Well-Known Member

    إنضم إلينا في:
    ‏11 اكتوبر 2010
    المشاركات:
    2,347
    عدد المعجبين:
    4,078
    مكان الإقامة:
    Gloucestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Fair enough, sounds reasonable. I followed the instructions on the L&B web page. What seemed to matter was the option support / not support. It's not clear to me how much the comments matter.
     