    Thanks very much for the quick response.
     
  2. sitimela43

    sitimela43 New Member

    Дата регистрации:
    17 окт 2019
    Сообщения:
    84
    Симпатии:
    123
    Пол:
    Мужской
    Адрес:
    Devon
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Axe will be taken out of service after hauling the Remembrance Day service train on Sunday 10th November. It will then undergo a complete overhaul after 16 years of service since the last overhaul.
     
    lynbarn, Bertie Lissie, Small Prairie и 3 другим нравится это.
  3. Old Kent Biker

    Old Kent Biker Member

    Дата регистрации:
    10 янв 2007
    Сообщения:
    940
    Симпатии:
    1.510
    Пол:
    Мужской
    Род занятий:
    IT Consultant (retired)
    Адрес:
    Kent UK
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    CharlesBingers, H Cloutt, RailWest и ещё 1-му нравится это.
  4. RailWest

    RailWest Part of the furniture

    Дата регистрации:
    7 дек 2011
    Сообщения:
    3.984
    Симпатии:
    7.800
    Пол:
    Мужской
    Адрес:
    West Country
    Noted, however:-

    Q. Provision of (equivalent) Grampian Conditions
    A. The Trust has no intention of piecemeal construction. We propose a programme of delivery whereby the development is split into sequential works packages. No work packages will be commenced until that work package is fully funded.


    I note that the final sentence does not say ALL work packages are funded. The implication therefore is that the work will be done in stages ("sequential works packages") without the need to have all the funding on place at the start .

    So...what if the work plan is to do A, then B, then C, then D etc, but once you have done A and B there is not enough money ready to do C, but there is enough to do D which is cheaper? Will they do D first, then come back to C, or if C is necessary in order to do then everything will come to a halt for a while? The Trust may have no intention of piecemeal construction, but it could end up like that in practice - I wonder what plans they have to avoid such a situation?
     
  5. Old Kent Biker

    Old Kent Biker Member

    Дата регистрации:
    10 янв 2007
    Сообщения:
    940
    Симпатии:
    1.510
    Пол:
    Мужской
    Род занятий:
    IT Consultant (retired)
    Адрес:
    Kent UK
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    The L&B Trust has today published details of its latest planning application on the website. If successful, this should go a long way to protecting the valuable heritage carriage assets.

    https://www.lynton-rail.co.uk/news/view/proposed-carriage-shelter-planning-application

    (For convenience, it is possible to view the documents without having to download them, from the planning portal: https://planning.agileapplications.co.uk/exmoor/application-details/24964 - just scroll down to the documents section, then click on the "eye" icon against each document)
     
    Last edited: 29 авг 2024
    87J, Biermeister, CharlesBingers и 3 другим нравится это.
  6. Axe +1

    Axe +1 New Member

    Дата регистрации:
    16 сен 2017
    Сообщения:
    192
    Симпатии:
    761
    Род занятий:
    Retired {Electronics Engineer}
    Адрес:
    Surrey
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Goldie, Old Kent Biker и RailWest нравится это.
  7. Mark Thompson

    Mark Thompson Well-Known Member

    Дата регистрации:
    10 сен 2017
    Сообщения:
    1.591
    Симпатии:
    3.934
    Пол:
    Мужской
    Адрес:
    E sussex
    Heritage Railway Volunteer:
    No I do not currently volunteer
    It needed to be just a couple of minutes longer, to cover the proposed carriage shed. It finished, and I was expecting it to continue after the ads.
     
  8. 21B

    21B Part of the furniture

    Дата регистрации:
    2 сен 2009
    Сообщения:
    3.889
    Симпатии:
    8.633
    Very on brand then. Needing to be a little longer.
     
    Chris86, Mark Thompson, green five и 3 другим нравится это.
  9. Sheff

    Sheff Resident of Nat Pres

    Дата регистрации:
    21 апр 2006
    Сообщения:
    8.057
    Симпатии:
    3.137
    Пол:
    Мужской
    Род занятий:
    Retired Engineer & Heritage Volunteer
    Адрес:
    N Warks
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I see what you did there ;)
     
  10. brmp201

    brmp201 Member

    Дата регистрации:
    18 май 2010
    Сообщения:
    614
    Симпатии:
    964
    Пол:
    Мужской
    Род занятий:
    IT Director
    Адрес:
    Surrey, UK
    Heritage Railway Volunteer:
    No I do not currently volunteer
  11. MellishR

    MellishR Resident of Nat Pres Friend

    Дата регистрации:
    16 апр 2009
    Сообщения:
    8.911
    Симпатии:
    5.847
  12. brmp201

    brmp201 Member

    Дата регистрации:
    18 май 2010
    Сообщения:
    614
    Симпатии:
    964
    Пол:
    Мужской
    Род занятий:
    IT Director
    Адрес:
    Surrey, UK
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Members are soon due the latest newsletter and magazine. I expect the plans and funding will be announced there.
    Let's just hope the planning application is approved and we can finally move forwards and break out from Killington Lane. Let's get this section done, then think about what comes next.
     
    Mark Thompson, Small Prairie и green five нравится это.
  13. 35B

    35B Nat Pres stalwart

    Дата регистрации:
    18 июн 2011
    Сообщения:
    28.731
    Симпатии:
    28.657
    Пол:
    Мужской
    Адрес:
    Grantham
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I'd like to see that this application supports that breakout - I understand answers exist, but this doubting Thomas would like to see the evidence.
     
  14. RailWest

    RailWest Part of the furniture

    Дата регистрации:
    7 дек 2011
    Сообщения:
    3.984
    Симпатии:
    7.800
    Пол:
    Мужской
    Адрес:
    West Country
    I see that the 'Proposed Site Plan' envisages the retention of KL platform and track. This seems to be the 'elephant in the room' that no-one talks about - what do they envisage for its future use and why?
     
  15. brmp201

    brmp201 Member

    Дата регистрации:
    18 май 2010
    Сообщения:
    614
    Симпатии:
    964
    Пол:
    Мужской
    Род занятий:
    IT Director
    Адрес:
    Surrey, UK
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Interesting question, although I'm not sure it's an elephant!
    We need to keep Killington Lane in operation throughout the build (with Cricket Field Lane opening in 2029) and I guess we need the siding space for the foreseeable future. I know that KL needs to revert to farmland at some point, but I don't know if the CFL extension actually triggers that.
     
  16. pmh_74

    pmh_74 Part of the furniture

    Дата регистрации:
    28 янв 2009
    Сообщения:
    2.423
    Симпатии:
    1.707
    And even if it does... the reversion hardly needs new planning permission, does it?
     
  17. RailWest

    RailWest Part of the furniture

    Дата регистрации:
    7 дек 2011
    Сообщения:
    3.984
    Симпатии:
    7.800
    Пол:
    Мужской
    Адрес:
    West Country
     
    brmp201 нравится это.
  18. 21B

    21B Part of the furniture

    Дата регистрации:
    2 сен 2009
    Сообщения:
    3.889
    Симпатии:
    8.633
    I may have this wrong, but I thing the reversion is triggered by extending the railway. The precise definition of that I don’t know. Does that mean at the point of breaking ground or the point at which it is ready to use? Either way it is sensible to clarify by obtaining permission to retain. Doing so beyond opening of the extended railway also provides flexibility, and, bearing in mind that if the railway were to extend further south beyond CFL then KL would be required again as a temporary terminal as CFL terminus will have to be removed.
     
  19. RailWest

    RailWest Part of the furniture

    Дата регистрации:
    7 дек 2011
    Сообщения:
    3.984
    Симпатии:
    7.800
    Пол:
    Мужской
    Адрес:
    West Country
    You first sentence reflects my understanding from way back with the original permission for KL. The second sentence reflects my view that the 'trigger' is undefined.
     
  20. Old Kent Biker

    Old Kent Biker Member

    Дата регистрации:
    10 янв 2007
    Сообщения:
    940
    Симпатии:
    1.510
    Пол:
    Мужской
    Род занятий:
    IT Consultant (retired)
    Адрес:
    Kent UK
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    The planning decision notice for Killington Lane dated 5/12/2005 (planning ref 62/43/05/003) states:

    The use of the Killington Lane site as a temporary station halt shall cease no later that 10 years from the date of this permission and all associated buildings and structures shall be removed from the site and thereafter the land shall revert to its previous condition.

    At the Killington Lane site, all works, including the excavations, shall take place within Field Parcel 1100 and for the avoidance of doubt the boundary fence, the boundary vegetation and trees between Field Parcel 1100 and Field Parcels 2500/2079 shall not be removed or altered without the prior agreement in writing of the Local Planning Authority.

    Assuming this deadline has been extended in subsequent applications, and that that can continue, it shouldn't be a major problem retaining KL until operations are well established at CFL
     