If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

Next New Build to be completed

Discussion in 'Steam Traction' started by Felix Holt, Feb 8, 2015.

  1. Gav106

    Gav106 Well-Known Member

    Joined:
    Mar 29, 2010
    Messages:
    1,742
    Likes Received:
    2,017
    Location:
    Nantwich, Cheshire
    I think 6880 has brand new frames. The frames from Willington Hall went to the County project and the boiler went to 6880.
     
  2. Martin Perry

    Martin Perry Nat Pres stalwart Staff Member Moderator Friend

    Joined:
    Apr 15, 2006
    Messages:
    16,515
    Likes Received:
    7,765
    Location:
    1012 / 60158
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Sorry that is not correct, I can assure you that the plate frames are new. (The Grange frames were closer to a 43xx or 'Manor' than to a 'Hall')
     
  3. std tank

    std tank Part of the furniture

    Joined:
    Sep 20, 2005
    Messages:
    3,819
    Likes Received:
    951
    Gender:
    Male
    Occupation:
    Retired
    Location:
    Liverpool
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Bound to be some confusion. There is that much pick and mix going on with these GWR "new builds".
     
  4. andalfi1

    andalfi1 Well-Known Member

    Joined:
    Nov 5, 2008
    Messages:
    1,007
    Likes Received:
    466
    Gender:
    Male
    Occupation:
    Semi Retired.
    Location:
    Haworth
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I am happy to bow to your superior knowledge :)

    The drawbacks of GWR standardisation :rolleyes:
     
  5. aron33

    aron33 Member

    Joined:
    May 22, 2016
    Messages:
    437
    Likes Received:
    563
    Gender:
    Male
    Location:
    United States
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Seems 2999 is getting nearer, since the tender rebuild is about complete, and cladding is to go on soon.
     
  6. Kinghambranch

    Kinghambranch Well-Known Member

    Joined:
    Dec 20, 2006
    Messages:
    1,872
    Likes Received:
    1,590
    Gender:
    Male
    Occupation:
    Retired
    Location:
    White Rose County
    Heritage Railway Volunteer:
    No I do not currently volunteer
    As I'm sure many of you are aware, 6880 Betton Grange is now at the NEC for the forthcoming Warley Model Railway Event. I'm not a member of the Betton Grange Group but I know some of the people involved and I've always been impressed with this reincarnation of a missing link in the GWR 4-6-0 "chain". Some images are on the 6880 pages:
    https://www.facebook.com/6880BettonGrangeSocietyLtd

    Whilst 6880 currently has 5952 Cogan Hall's boiler fitted for the display whilst its own (from 7929 - Willington Hall) is overhauled and prepared for use, it certainly looks every inch the "Hall with smaller wheels" (not quite as simple as that of course!) and this, alleged, "Engineman's Engine" will be a treat to see when its up and running and it will, in my view, be a useful addition to the Llangollen Fleet. Soon enough, we will be able to witness the entire GWR 4-6-0 family, from the "Saint" to the "County". Whether this warrants the demise of some of the "Barry Ten" locos is a matter of much debate we know but all of the latter exist already in working order. So, if anyone is visiting the NEC this weekend (I'm unable to do so regrettably) some photos would be welcomed!
     
  7. Matt37401

    Matt37401 Nat Pres stalwart

    Joined:
    Jun 8, 2014
    Messages:
    15,463
    Likes Received:
    11,815
    Occupation:
    Nosy aren’t you?
    Location:
    Nowhere
    Heritage Railway Volunteer:
    No I do not currently volunteer
    All GW 4-6-0's look the same! I'm joking! Crikey is it Warley already? Last time I went there I was 14 and 922203 was the Star. Ruddy hell!
     
    Gav106 likes this.
  8. FairlieSquarelie

    FairlieSquarelie New Member

    Joined:
    Oct 31, 2013
    Messages:
    66
    Likes Received:
    54
    Occupation:
    Losing slowly
    Location:
    1,500 miles from home
    For those who haven't yet seen the latest from the narrow-gauge forum ('Lyn'), this is how their 'next new-build' contender is shaping up:
    [​IMG]
     
  9. paulhitch

    paulhitch Guest

    Ntce picture. Piston valves seem far from "straight ported" though!

    PH
     
  10. andalfi1

    andalfi1 Well-Known Member

    Joined:
    Nov 5, 2008
    Messages:
    1,007
    Likes Received:
    466
    Gender:
    Male
    Occupation:
    Semi Retired.
    Location:
    Haworth
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Nice to see two 'outlines from the past' reappearing this week, this along with the Grange, excellent...
     
    green five likes this.
  11. Matt37401

    Matt37401 Nat Pres stalwart

    Joined:
    Jun 8, 2014
    Messages:
    15,463
    Likes Received:
    11,815
    Occupation:
    Nosy aren’t you?
    Location:
    Nowhere
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Perchance it doth awaken from it's slumber...
     
  12. MellishR

    MellishR Resident of Nat Pres Friend

    Joined:
    Apr 16, 2009
    Messages:
    8,154
    Likes Received:
    5,227
    Is it known why the original Lyn was built as a 2-4-2 rather than 2-6-2 like all the other L&B locos? Having one less driving axle would mean either less total adhesion weight or a much higher axle loading, either of which would seem to be undesirable.
     
  13. S.A.C. Martin

    S.A.C. Martin Part of the furniture

    Joined:
    Aug 31, 2010
    Messages:
    5,591
    Likes Received:
    9,325
    Gender:
    Male
    Occupation:
    Asset Engineer (Signalling), MNLPS Treasurer
    Location:
    London
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Having caught up with the news this last week - isn't it wonderful? This year we've seen the Star take leaps forward, the Grange too. Lyn looks amazing: the outline of a Gresley P2 has reawakened. There's a standard 3MT coming on in spades and there's a Brighton Atlantic preparing to receive its boiler once overhauled. Many more besides.

    Every time someone asks me if the future of preservation is bleak, I look to the new builds. It's only bleak if we make it bleak. Yes, there are clear issues that need addressing in how we finance, support, and develop our preserved railways but the determination and ingenuity on show is always inspirational.
     
    andalfi1, Martin Perry and Matt37401 like this.
  14. Matt37401

    Matt37401 Nat Pres stalwart

    Joined:
    Jun 8, 2014
    Messages:
    15,463
    Likes Received:
    11,815
    Occupation:
    Nosy aren’t you?
    Location:
    Nowhere
    Heritage Railway Volunteer:
    No I do not currently volunteer
    What's the old proverb? May you live in intresting times? We are certainly living in those! As I mentioned in a previous post there were 3 new builds on show at Bridgnorth last weekend. Much as some might want us to think, I don't think we're sailing into a black hole just yet!
     
  15. ghost

    ghost Part of the furniture

    Joined:
    May 29, 2006
    Messages:
    3,996
    Likes Received:
    5,121
    Gender:
    Male
    Location:
    N.Ireland
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Which Star would that be? ;)


    Keith
     
  16. Kinghambranch

    Kinghambranch Well-Known Member

    Joined:
    Dec 20, 2006
    Messages:
    1,872
    Likes Received:
    1,590
    Gender:
    Male
    Occupation:
    Retired
    Location:
    White Rose County
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I think he means the "Saint", 2999 at Didcot! This project seems to have been going on for years, but it must be close to completion now. I believe that the project was originally launched back in the early 1980s but was put on hold because of a lack of financial interest at the time - was this the case or am I getting confused.com ?
     
  17. ghost

    ghost Part of the furniture

    Joined:
    May 29, 2006
    Messages:
    3,996
    Likes Received:
    5,121
    Gender:
    Male
    Location:
    N.Ireland
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I realise that - just thought it was too good an opportunity to raise a laugh! I half expected a certain person to jump in to announce that he was building a Star... :)


    Keith
     
    MellishR likes this.
  18. ilvaporista

    ilvaporista Part of the furniture

    Joined:
    Jan 16, 2006
    Messages:
    4,274
    Likes Received:
    5,328
    Gender:
    Male
    Occupation:
    C.Eng
    Location:
    On the 45th!
    On the Saint I have a copy of an article from 1973 with the plan to convert Maindy Hall. That would make it one of the oldest 'new builds'. Unless you know different..
     
    Kinghambranch likes this.
  19. Reading General

    Reading General Part of the furniture

    Joined:
    May 18, 2011
    Messages:
    6,081
    Likes Received:
    2,217
    As far as I recall a loco was needed urgently and UK builders couldn't oblige so the order went to Baldwin who supplied the nearest they could to the spec.
     
  20. GWR4707

    GWR4707 Nat Pres stalwart

    Joined:
    May 12, 2006
    Messages:
    18,150
    Likes Received:
    15,888
    Gender:
    Male
    Location:
    Cumbria
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Maindy was secured to build the Saint in the 70's, however the project only really kicked off in the mid 90's.

    Its interesting that the Grange (rightly) is billed as the 'engineman's locomotive' as I was always told that the drivers all got dewy eyed in the 1960's when reminiscing about their Saints!
     

Share This Page