If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

Tornado

الموضوع في 'Steam Traction' بواسطة Leander's Shovel, بتاريخ ‏20 اكتوبر 2007.

  1. class8mikado

    class8mikado Part of the furniture

    إنضم إلينا في:
    ‏1 جوان 2009
    المشاركات:
    3,840
    عدد المعجبين:
    1,644
    الوظيفة:
    Print Estimator/ Repository of Useless Informatio.
    مكان الإقامة:
    Bingley W.Yorks.
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Wondering where Tornado will go to get fixed up. Going to take a few weeks minimum to have new parts made once its figured out what is required . I don't suppose the NVR will mind having such a high profile Guest in the Yard but don't know what kind of workshop/ space they have available. Crewe aren't taking on, NRM have SNG, Hopetown is full of P2 - everywhere seems pretty busy...
     
    أعجب بهذه المشاركة jnc
  2. Victor

    Victor Nat Pres stalwart Friend

    إنضم إلينا في:
    ‏20 أوت 2006
    المشاركات:
    14,526
    عدد المعجبين:
    9,197
    الوظيفة:
    Retired
    مكان الإقامة:
    DEWSBURY West Yorkshire
    Mr Riley ?? Kiss and make up at 10A ??
     
  3. GWR4707

    GWR4707 Nat Pres stalwart

    إنضم إلينا في:
    ‏12 ماي 2006
    المشاركات:
    19,232
    عدد المعجبين:
    17,566
    الجنس:
    ذكر
    مكان الإقامة:
    Cumbria
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Didn't she have her winter maintenance away from base (IIRC GCR?? could be entirely wroing), assume that she can possibly return there? NYMR would be relatively near base?
     
  4. Sheff

    Sheff Resident of Nat Pres

    إنضم إلينا في:
    ‏21 إبريل 2006
    المشاركات:
    8,058
    عدد المعجبين:
    3,137
    الجنس:
    ذكر
    الوظيفة:
    Retired Engineer & Heritage Volunteer
    مكان الإقامة:
    N Warks
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Locomotive Maintenance Services Limited, Loughborough
     
  5. GWR4707

    GWR4707 Nat Pres stalwart

    إنضم إلينا في:
    ‏12 ماي 2006
    المشاركات:
    19,232
    عدد المعجبين:
    17,566
    الجنس:
    ذكر
    مكان الإقامة:
    Cumbria
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Ta - so I was at least slightly right! ;)
     
  6. NSWGR 3827

    NSWGR 3827 New Member

    إنضم إلينا في:
    ‏18 يناير 2009
    المشاركات:
    93
    عدد المعجبين:
    40
    الجنس:
    ذكر
    الوظيفة:
    Fitter & Machineist
    مكان الإقامة:
    Down Under
    From the photo of the broken bit you can clearly see the broken (top) end of the combination lever is Blue (somewhere around 290- 330 deg C [editied due to misreading as deg F), from which you can assume because it has got quite hot. After a little bit of online research suggests the melting point of bronze is about 900, which is considerably higher than what the rod appears to have got to, this temperature would however be sufficient to melt the whitemetal in the valve crosshead guide?, explaining the presence of metal fragments in the video taken at Peterborough. (Looking at the video again does the end of the radius rod look like it has been a bit warm too?)
    To explain a little more what I think may have occurred, the pin in the combination lever that goes through the intermediate valve spindle has for whatever reason suffered some sort of lubrication failure which has resulted in said pin overheating and eventually seizing. As the combination lever would now be unable to swing, the force provided by the connecting rod and crosshead would be more than sufficient to break the lever and crosshead.

    The reason I say what I have is because I have seen quite a few bent and broken bits of motion over the years but have only seen one that has overheated before, this was the result of a pin in what we call the combination link (or union link) seizing, the end result being a severely bent combination lever and a broken cross head.
     
    Last edited: ‏19 إبريل 2018
  7. W.Williams

    W.Williams Well-Known Member

    إنضم إلينا في:
    ‏20 ديسمبر 2015
    المشاركات:
    1,650
    عدد المعجبين:
    1,559
    الوظيفة:
    Mechanical Engineer
    مكان الإقامة:
    Aberdeenshire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    The combi link didn't immediately fracture once it became constrained by the stuck valve. We know this because it is clearly bent in the pictures with a smooth fracture surface that appears to have necking also. Ergo, not a fast fracture for the combi link.

    Bluing starts much lower than that.

    upload_2018-4-18_12-54-20.png

    The fragments, to me , look like thrashing damage, rather than white metal, which would have dripped out over the motion and below the viewpoint of the video further up the thread.

    Im standing by the bending theory, leading to strain hardening, and fatigue fracture for the combi link.
     
    The Green Howards و Martin Perry معجبون بهذا.
  8. The Black Hat

    The Black Hat Member

    إنضم إلينا في:
    ‏7 اكتوبر 2010
    المشاركات:
    860
    عدد المعجبين:
    399
    الوظيفة:
    Defender of the Faith
    مكان الإقامة:
    51F
    The incident with Tornado is unfortunate as it seems to have been by chance that the 90 mph run with the public has been when the part failed. I do not think that the speed will have been an ultimate factor - although the increase in speed might have made the part fail a lot faster than if the engine was doing 75.

    It shows a number of things;

    1. That Tornado (like I have said before) might be new build, but is still a design operating with 1948 ish tech. Motion and everything else is running just has it has like older engines. The age of Tornado doesn't really come into it, as all engines fail, but what it does show is that Tornado at 90 failing is unfortunate as other engines still running today would have failed if the same set of circumstance befell them. Its also another reason why they too could also do 90 if they wanted, but its sad to see it happening on a 90mph run that Tornado's group had pushed for and justified their using their newer machine.

    2. That the trust have moved fast to publish information and limit speculation. The statements put out are good by the trust as they have put out where they believe the cause to be, pending further investigation. The damage limitation to the idea and their image has been to offer compensation and explain cancelled events in the near future. While moving fast here has been good as it limits the speculation and thus controls the story, its been well executed to protect their brand. Its been a lesson in how to do it, but I don't think they need worry about the damage to their iconic place on the railway too much. They will get it fixed and return to run on a regular basis at 90mph.

    This has been an unfortunate incident which has dealt Tornado a set back and valuable information and lessons to ensure future successful operation. I'm sure that Tornado and the trust here will soon be ready to resume further high speed running on a regular basis, as they continue to set new boundaries and push for maximum performance, profitability and efficiency in mainline steam operation.
     
    gricerdon, Eric Tyler, Sheff و 1 شخص آخر معجبون بهذا.
  9. The Green Howards

    The Green Howards Nat Pres stalwart

    إنضم إلينا في:
    ‏20 فبراير 2016
    المشاركات:
    15,105
    عدد المعجبين:
    8,633
    الوظيفة:
    Layabout
    مكان الإقامة:
    My settee, mostly.
    Heritage Railway Volunteer:
    No I do not currently volunteer
    From memory the machining for 60103 was done at Riley's, but lifting, fitting etc. was done at the NVR. There's a thread on it on this board.

    There's lots of room out in the yard.
     
  10. class8mikado

    class8mikado Part of the furniture

    إنضم إلينا في:
    ‏1 جوان 2009
    المشاركات:
    3,840
    عدد المعجبين:
    1,644
    الوظيفة:
    Print Estimator/ Repository of Useless Informatio.
    مكان الإقامة:
    Bingley W.Yorks.
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Yes Mr 55, but why hire in huge cranes everytime you want to lift something out...
     
  11. Allegheny

    Allegheny Member

    إنضم إلينا في:
    ‏8 ماي 2015
    المشاركات:
    637
    عدد المعجبين:
    311
    الجنس:
    ذكر
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I don't know whether it was related to the problem, but just wondering if the new middle cylinder cast for Blue Peter would be available, if required.
     
  12. LMS2968

    LMS2968 Part of the furniture

    إنضم إلينا في:
    ‏1 سبتمبر 2006
    المشاركات:
    3,072
    عدد المعجبين:
    5,361
    الجنس:
    ذكر
    الوظيفة:
    Lecturer retired: Archivist of Stanier Mogul Fund
    مكان الإقامة:
    Wigan
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Now people really are getting carried away. The idea that an engine lift would be needed has no foundation in fact, but a replacement cylinder?

    I suspect that the repairs will be carried out on the NVR. Unless there is serious damage to the valve chest, and even that would be limited to a replacement liner or, more likely, a rebore, I see little point in taking it elsewhere.
     
    Aberdare, 60835, MarkinDurham و 6 آخرون معجبون بهذا.
  13. W.Williams

    W.Williams Well-Known Member

    إنضم إلينا في:
    ‏20 ديسمبر 2015
    المشاركات:
    1,650
    عدد المعجبين:
    1,559
    الوظيفة:
    Mechanical Engineer
    مكان الإقامة:
    Aberdeenshire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Seconded. I suspect at worst it’s a middle cylinder out task, but I feel it’s more likely a replaced liner and whatever parts got a beating in the ensuing drama post failure.
     
  14. class8mikado

    class8mikado Part of the furniture

    إنضم إلينا في:
    ‏1 جوان 2009
    المشاركات:
    3,840
    عدد المعجبين:
    1,644
    الوظيفة:
    Print Estimator/ Repository of Useless Informatio.
    مكان الإقامة:
    Bingley W.Yorks.
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Heaven forbid that they should need it but the Middle Cylinder block from BluePeter isn't as wide because Tornado has 1 piece frames at the front end...
     
  15. Spamcan81

    Spamcan81 Nat Pres stalwart

    إنضم إلينا في:
    ‏25 أوت 2007
    المشاركات:
    35,831
    عدد المعجبين:
    22,271
    الوظيفة:
    Training moles
    مكان الإقامة:
    The back of beyond
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I agree. The NVR has pretty good facilities these days on the engineering front.
     
  16. Johnb

    Johnb Nat Pres stalwart

    إنضم إلينا في:
    ‏3 ديسمبر 2014
    المشاركات:
    15,538
    عدد المعجبين:
    18,385
    الجنس:
    ذكر
    الوظيفة:
    Retired, best job I've ever had
    مكان الإقامة:
    Buckinghamshire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I think 90% of what is said on here has no basis in fact. The A1 Trust are updating the situation almost as quickly as it happens so why all the conjecture just wait.
     
    jnc, ross, gwalkeriow و 4 آخرون معجبون بهذا.
  17. S.A.C. Martin

    S.A.C. Martin Part of the furniture

    إنضم إلينا في:
    ‏31 أوت 2010
    المشاركات:
    5,615
    عدد المعجبين:
    9,418
    الجنس:
    ذكر
    الوظيفة:
    Asset Engineer (Signalling), MNLPS Treasurer
    مكان الإقامة:
    London
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Why let the facts get in the way of good old speculative dribble? :confused:
     
    MellishR, ross, 35B و 5 آخرون معجبون بهذا.
  18. 30854

    30854 Resident of Nat Pres

    إنضم إلينا في:
    ‏8 مارس 2017
    المشاركات:
    12,172
    عدد المعجبين:
    11,496
    الجنس:
    ذكر
    الوظيفة:
    Retired
    مكان الإقامة:
    Brighton&Hove
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Good luck with that! You're not the first (or second or third etc.) to post such a plea. And at least this time we've learned a fair bit of useful stuff about the behaviour of certain steel grades at various temperatures. :)
     
    CH 19, Bifur01, W.Williams و 1 شخص آخر معجبون بهذا.
  19. The Green Howards

    The Green Howards Nat Pres stalwart

    إنضم إلينا في:
    ‏20 فبراير 2016
    المشاركات:
    15,105
    عدد المعجبين:
    8,633
    الوظيفة:
    Layabout
    مكان الإقامة:
    My settee, mostly.
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I'd take it as a given it'll be done at the NVR! As our canned meat colleague has already stated, the NVR has pretty good engineering facilities; after all, Riley's saw no reason to move 60103 from there when it became an Accidental Atlantic...

    I might pop down on Sunday for a look-see and Sunday lunch. Plus a certain bright green engine with yellow stripes is running.

    Yes, I'd not seen that colour chart before... :)
     
    Last edited: ‏18 إبريل 2018
  20. Lplus

    Lplus Well-Known Member

    إنضم إلينا في:
    ‏24 نوفمبر 2011
    المشاركات:
    1,919
    عدد المعجبين:
    991
    مكان الإقامة:
    Waiting it out.
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I think at least 95% of what has been said on here has most certainly been based on the facts we have been told and have seen on video and photograph. Whilst I'll agree the idea of a cylinder block change is close to the realms of fantasy, everything else has been based on and extrapolated from evidence received. Terribly sorry if we're discussing your beloved loco in the manner of doctors discussing a sick person, but for those of us who actually carry out mechanical work on steam locos, failure modes and the results are of interest.

    It's a steam engine, not a religion.
     
    Spinner, Smokestack Lightning, jnc و 4 آخرون معجبون بهذا.

مشاركة هذه الصفحة