If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

Un-rebuilding locomotives

Тема в разделе 'Steam Traction', создана пользователем SR.Keoghoe, 10 окт 2015.

  1. Jimc

    Jimc Part of the furniture

    Дата регистрации:
    8 сен 2005
    Сообщения:
    4.119
    Симпатии:
    4.822
    Род занятий:
    Once computers, now part time writer I suppose.
    Адрес:
    SE England
    Heritage Railway Volunteer:
    No I do not currently volunteer
    At the risk of life long emnity, in my trade we use the term debugged when we've removed problems in our original work. Would, therefore, the re-introduction of design features historically deemed problematic be re-bugging?
     
    S.A.C. Martin и 35B нравится это.
  2. 35B

    35B Nat Pres stalwart

    Дата регистрации:
    18 июн 2011
    Сообщения:
    29.507
    Симпатии:
    30.066
    Пол:
    Мужской
    Адрес:
    Grantham
    Heritage Railway Volunteer:
    No I do not currently volunteer
    But software doesn't have bugs, it has features! Perhaps "re-featuring" might be better;)
     
    Corbs нравится это.
  3. Miff

    Miff Part of the furniture Friend

    Дата регистрации:
    17 июн 2008
    Сообщения:
    3.072
    Симпатии:
    3.172
    Uninstalling? We have the Un Problem again but this seems to be universally accepted when talking about software. So you could say 'we propose to uninstall Jarvis 2.1' (I am wearing my coat - it is unknown whether the latest Bulleid Service Pack is still available for download).
     
    Last edited: 13 окт 2015
    Kje7812, S.A.C. Martin, Corbs и 2 другим нравится это.
  4. Jimc

    Jimc Part of the furniture

    Дата регистрации:
    8 сен 2005
    Сообщения:
    4.119
    Симпатии:
    4.822
    Род занятий:
    Once computers, now part time writer I suppose.
    Адрес:
    SE England
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Its funny actually ( he said, drifting even further off topic if I can be forgiven), but I've been struggling with the problems of version control in a study I'm doing of GW tenders. Looking at some apparently contradictory sources I'm beginning to think that certain batches may have been built to one GA drawing, but maintenance done to a later one (seems reasonable). However the construction register doesn't mention this, so its how to find out if its still recorded anywhere... With the locomotives Swindon seems to have done their version control by date and colour (master drawings saying "altered in red (or whatever), [date given]"...
     
  5. LesterBrown

    LesterBrown Member

    Дата регистрации:
    20 янв 2009
    Сообщения:
    995
    Симпатии:
    761
    Адрес:
    Devon
    You could even get two for the price of one here, Bulldog 3425 with a No 2 boiler (spare prairie anywhere?) and Duke 3258 "The Lizard" (new frames, wheels cylinders and motion etc.).

    Granted there probably wouldn't be anything of the original 3258 but if they wanted the Earl reassembled all the new bits would make a nice replica of an early curved frame Bulldog.
     
  6. Jimc

    Jimc Part of the furniture

    Дата регистрации:
    8 сен 2005
    Сообщения:
    4.119
    Симпатии:
    4.822
    Род занятий:
    Once computers, now part time writer I suppose.
    Адрес:
    SE England
    Heritage Railway Volunteer:
    No I do not currently volunteer
    On 9017 you can still see where the over firebox circular glasses were blocked off in the 1920s. Its not the original narrow cab, but its certainly an ex Duke cab. At a guess it dates to 1912 when the first belpaire boiler went on 3258.
     
    LesterBrown нравится это.
  7. Jamessquared

    Jamessquared Nat Pres stalwart

    Дата регистрации:
    8 мар 2008
    Сообщения:
    28.158
    Симпатии:
    66.080
    Адрес:
    LBSC 215
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    That idea gets discussed almost every year on the Bluebell, normally round about April 1st ...

    Tom
     
  8. Jimc

    Jimc Part of the furniture

    Дата регистрации:
    8 сен 2005
    Сообщения:
    4.119
    Симпатии:
    4.822
    Род занятий:
    Once computers, now part time writer I suppose.
    Адрес:
    SE England
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Maybe you should consider a Bulldog as a new build project after the Atlantic[grin]... It ought to be one of the easier extinct class rebuilds to research since just about every component exists on other classes, and you wouldn't even need to build a tender... And the extra boiler capacity/pressure over 9017 ought to be useful. I wonder if they would have worked over the Reading/Redhill/Tonbridge line before Holcroft's 43s took over the duty? That would be a nice Southern connection.
     

Поделиться этой страницей