  1. spicer21

    spicer21 Guest

    Quite so
     
  2. Steamage

    Steamage Part of the furniture

    إنضم إلينا في:
    ‏14 سبتمبر 2005
    المشاركات:
    4,748
    عدد المعجبين:
    1,121
    مكان الإقامة:
    Oxford
    Not sure about that. ORR has its own responsibilities related the H&S rules and so on, which are independent of NR's operation licence and track-access decisions. What they might each be waiting for, though, is the RAIB report into the SN45 SPAD. Any idea when that might be completed? I guess WCRC, ORR and NR will have sight of it before it's published.
     
  3. Sheff

    Sheff Resident of Nat Pres

    إنضم إلينا في:
    ‏21 إبريل 2006
    المشاركات:
    8,059
    عدد المعجبين:
    3,138
    الجنس:
    ذكر
    الوظيفة:
    Retired Engineer & Heritage Volunteer
    مكان الإقامة:
    N Warks
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    RAIB reports generally take around 10 - 12 months from notification to publication, so let's hope that's not what NR/ORR are waiting for!
     
  4. Steamage

    Steamage Part of the furniture

    إنضم إلينا في:
    ‏14 سبتمبر 2005
    المشاركات:
    4,748
    عدد المعجبين:
    1,121
    مكان الإقامة:
    Oxford
    Ah, right-hoh. NR's time-line is 4-6 weeks, and I guess it's much the same for ORR.

    I wonder how many new bookings RTC and SD have received since Good Friday, and how many of those they've felt able to accept? It must be a worrying time to be running those businesses right now.
     
  5. mrKnowwun

    mrKnowwun Part of the furniture

    إنضم إلينا في:
    ‏22 اكتوبر 2011
    المشاركات:
    4,366
    عدد المعجبين:
    2,823
    الوظيفة:
    Retired
    مكان الإقامة:
    West Byfleet
    Heritage Railway Volunteer:
    No I do not currently volunteer
    In simple terms, it has launched formal proceedings to revoke WCR’s safety certificate.

    Correct, it does not say or mean that at all. Its a very poor piece of journalism.
     
  6. mrKnowwun

    mrKnowwun Part of the furniture

    إنضم إلينا في:
    ‏22 اكتوبر 2011
    المشاركات:
    4,366
    عدد المعجبين:
    2,823
    الوظيفة:
    Retired
    مكان الإقامة:
    West Byfleet
    Heritage Railway Volunteer:
    No I do not currently volunteer
    My major concern out of all this, is the likelihood of WCRC throwing their toys out of the pram, chucking steam charters down the pan, throwing the blame solely onto ORR and NW and trying the Big Bad Brother spoilsports routine.
     
  7. 61624

    61624 Part of the furniture

    إنضم إلينا في:
    ‏27 سبتمبر 2006
    المشاركات:
    5,294
    عدد المعجبين:
    3,599
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I'd have thought there's too much invested in steam locos by WCR for them to throw their toys out of the pram, unless there is a massive sell-off - but if there was, would the market be able to absorb such a quantity of stock?
     
  8. Steamage

    Steamage Part of the furniture

    إنضم إلينا في:
    ‏14 سبتمبر 2005
    المشاركات:
    4,748
    عدد المعجبين:
    1,121
    مكان الإقامة:
    Oxford
    DS and his partners probably feel like doing that (especially given all the flack that must be coming their way at the moment!), but I think sense will prevail. What they need is an experienced railwayman as "Director Of Operations" or something of the sort. That's quite a recruitment challenge ;-)
     
    conrailuk و Bean-counter معجبون بهذا.
  9. BillyReopening

    BillyReopening Member

    إنضم إلينا في:
    ‏17 سبتمبر 2012
    المشاركات:
    830
    عدد المعجبين:
    581
    الجنس:
    ذكر
    الوظيفة:
    Freelance Trumpet Player // IT Engineer
    مكان الإقامة:
    South West
    Heritage Railway Volunteer:
    No I do not currently volunteer
    In a way, it needs a director of operations that has NEVER worked in the rail industry before but is a competant and experienced manager - and therefore has to learn the correct way first from the various authorities and then applies things within WCR..
     
    أعجب بهذه المشاركة 99Z
  10. Bean-counter

    Bean-counter Part of the furniture

    إنضم إلينا في:
    ‏21 جويلية 2007
    المشاركات:
    5,844
    عدد المعجبين:
    7,688
    الجنس:
    ذكر
    مكان الإقامة:
    Former NP Member
    Heritage Railway Volunteer:
    No I do not currently volunteer
    While I can see you line of thought, the system doesn't work in a way that it could be applied here. It is up to the TOC to develop its own SMS and this includes monitoring to ensure compliance. Given a suitable approach, obtaining some guidance from ORR is not impossible but if somebody who clearly had no experience of the areas they are seeking to be responsible for in a senior role were asking about the very basics, I am sure ORR would see that as indicating they were unsuitable for the role they held. Gone are the days (familiar to the heritage sector) of asking an HMRI such Major Peter Olver for his judgement or approval of new works etc. Even then, the Major (a true gentleman and a very great "critical friend" of the heritage movement) would expect to see options presented for guidance not a "we have this problem - what do we do?" approach.

    Hence, people with experience and relevant knowledge is exactly what any TOC needs in the senior posts. That could be from a similarly safety dependent industry (the network rail CEO is from the petrochemical industry, I believe) but again it will depend on the size of the organisation and hence the extent and breadth of its senior team - the smaller the outfit, the less room for those lacking immediately relevant experience.

    I am equally sure that ORR will look for the appropriate approach to the importance of safety ("safety culture") and the lead on safety coming from any senior post holders. I would suggest the attitude on this has gradually hardened over the years and relevant knowledge and experience and definite evidence of safety culture are much more important today than even a small number of years back.

    None of these comments relate specifically to the case under discussion - just the sense I have picked up from others in the industry of the general expectation and requirements - and probably not just for those operating on Network Rail metals but, suitably adjusted to take account of an organisations level of operations, on any "guided transport system".

    Steven
     
    oddsocks, andrewtoplis و Sheff معجبون بهذا.
  11. Fred Kerr

    Fred Kerr Resident of Nat Pres Friend

    إنضم إلينا في:
    ‏24 مارس 2006
    المشاركات:
    8,383
    عدد المعجبين:
    5,368
    الجنس:
    ذكر
    الوظيفة:
    Freelance photo - journalist
    مكان الإقامة:
    Southport
    Do I hear a call for Chris Green - the no-nonsense manager who seems to succeed with every task he has been given; in that context his ScotRail experiences will surely help with the "Jacobite" as a first step in the necessary reorganisation of WCRC.
     
    أعجب بهذه المشاركة conrailuk
  12. Steve Sienkiewicz

    Steve Sienkiewicz Member

    إنضم إلينا في:
    ‏21 ماي 2010
    المشاركات:
    315
    عدد المعجبين:
    2,685
    الجنس:
    ذكر
    الوظيفة:
    Retired
    مكان الإقامة:
    Near Garstang, Lancashire
    Toys out of pram simply isn't an option, surely. There is too much at stake for WCR, it's employees, partners and a whole host of other stakeholders. Whatever the rights and wrongs of the suspension (and incidentally, I don't recall seeing anyone arguing against it being justified), it is in everyone's interest, but primarily WCR's, to work towards meeting Network Rail's criteria which will hopefully see a return to operations. This is obviously a very complex situation and the involvement of the ORR adds to that complexity, but let's be positive and hope for a resolution within the next few weeks.
     
  13. Sheff

    Sheff Resident of Nat Pres

    إنضم إلينا في:
    ‏21 إبريل 2006
    المشاركات:
    8,059
    عدد المعجبين:
    3,138
    الجنس:
    ذكر
    الوظيفة:
    Retired Engineer & Heritage Volunteer
    مكان الإقامة:
    N Warks
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    What's Adrian Shooter up to since he retired? He had/has some involvement with Moorlands and City, but I'd have thought that wasn't very onerous right now.
     
  14. daveannjon

    daveannjon Well-Known Member

    إنضم إلينا في:
    ‏31 مارس 2006
    المشاركات:
    1,114
    عدد المعجبين:
    425
    مكان الإقامة:
    Waiting for the Right Away
    He's busy as CEO of Vivarail, putting Ford engines in ex-LT D Stock to replace the BL**DY Pacers!
    Dave
     
  15. Swiss Toni

    Swiss Toni Well-Known Member

    إنضم إلينا في:
    ‏9 نوفمبر 2008
    المشاركات:
    1,961
    عدد المعجبين:
    3,664
    مكان الإقامة:
    Switzshire
    Kje7812, 47406, Waterbuck و 2 آخرون معجبون بهذا.
  16. Steamage

    Steamage Part of the furniture

    إنضم إلينا في:
    ‏14 سبتمبر 2005
    المشاركات:
    4,748
    عدد المعجبين:
    1,121
    مكان الإقامة:
    Oxford
    If the company's called "VivaRail", should he be using Vauxhall engines, not Ford?
    (It's OK, I'm just leaving...)
     
    oddsocks, Spamcan81, rule55 و 3 آخرون معجبون بهذا.
  17. mrKnowwun

    mrKnowwun Part of the furniture

    إنضم إلينا في:
    ‏22 اكتوبر 2011
    المشاركات:
    4,366
    عدد المعجبين:
    2,823
    الوظيفة:
    Retired
    مكان الإقامة:
    West Byfleet
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Push the emergency door release quickly someone.....
     
  18. twr12

    twr12 Well-Known Member

    إنضم إلينا في:
    ‏2 سبتمبر 2007
    المشاركات:
    1,658
    عدد المعجبين:
    820
    People with long memories may care to remember why David Smith used the opportunities created at privatisation to set up a TOC.
    All because InterCity Charters and SLOA were too snobbish to use his mere freight engine (48151) any more than 4 times each year.
    Who knows if he has the same resolve this time to find a solution? I bet he does!
     
  19. johnofwessex

    johnofwessex Resident of Nat Pres

    إنضم إلينا في:
    ‏6 إبريل 2015
    المشاركات:
    9,748
    عدد المعجبين:
    7,859
    الجنس:
    ذكر
    الوظيفة:
    Thorn in my managers side
    مكان الإقامة:
    72
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Any news from Scotland

    I suggest that in view of the importance they attached to steam tourist services in the recent tendering process for the Scotrail franchise & the impact of the possible loss of The Jacobite they may want to get involved
     
  20. johnofwessex

    johnofwessex Resident of Nat Pres

    إنضم إلينا في:
    ‏6 إبريل 2015
    المشاركات:
    9,748
    عدد المعجبين:
    7,859
    الجنس:
    ذكر
    الوظيفة:
    Thorn in my managers side
    مكان الإقامة:
    72
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Thinking about it basically whats needed is some sort of desire across the industry to see steam continue on the main line, and a willingness to do whats needed to make it happen safely.
     